                                         (b)    installing protective fencing around
                                                the dripline of vegetation; and
                                         (c)    ensuring stock pling, storage and
                                                vehicle parking occur outside the
                                                areas of vegetation to be retained.
                                         AO12.6
                                         Where clearance of habitat is unavoidable,
                                         once the area disturbed by the works is re-
                                         established, replacement habitat is planted
                                         in proximity of the works to create native
                                         fauna habitat suitable for the area and
                                         maintained for the life of the works.
 PO13                                    AO13                                             N/A     PO13 not applicable
 Road infrastructure is constructed to   Road infrastructure is constructed in                    The development does not propose any new road
 minimise adverse environmental          accordance with Council’s Planning                       infrastructure.
 impacts, including from run-off and     Scheme Policy PSP6 Engineering Design
 erosion                                 Standards – Roads, drainage and earthworks


External Works and Infrastructure               Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                     Acceptable Outcomes                          Compliance Response
                                                                                         //NA
 External Works and Infrastructure
 PO14                                    AO14                                             N/A     PO14 not applicable
 Development is provided with external   Where not already existing, the following                Civil engineering design is beyond the scope of this
 works—                                  infrastructure components are provided at                traffic assessment.
 (a)    along the full extent of the     the frontage of the site—.                               Refer to MPN Consulting’s Civic Engineering report
        frontage of the site to an                                                                for further information.
        appropriate standard having      (a)   full width sealed road;
        regard to the specified          (b)   concrete kerb and channel where
        function of the road; and              appropriate;
  (b)   provided beyond the site’s       (c)   forming and grading to footpaths;
        frontage if required.            (d)   vehicular kerb and footpath
                                               crossing;
                                         (e)   a constructed bikeway;

Log in to download the original (Appendix E- Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.