Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix E- Traffic Impact Assessment

of 151

Page text read automatically using OCR, there may be inaccuracies

                                            (f)   a constructed footpath;
                                            (g)   a constructed carriageway;
                                            (h)   required alterations to public utility
                                                  mains, services or installations;
                                            (i)   construction of any required
                                                  alterations to public utility mains,
                                                  services of installations;
                                            (j)   stormwater drainage works; and
                                            (k)   installation of electrical conduits.
 PO15                                       No acceptable outcome provided                    N/A     PO15 not applicable
 Any alterations or repairs to                                                                        Civil engineering aspects are beyond the scope of
 infrastructure as a result of the                                                                    this traffic assessment.
 development are made at no cost to
 Council.
 PO16                                       No acceptable outcome provided                    N/A     PO14 not applicable
 Road infrastructure is proven to be                                                                  Civil engineering aspects are beyond the scope of
 suitable for its use prior to Council                                                                this traffic assessment.
 accepting the dedicated asset.                                                                       No road dedication is proposed.


Staged development Table 9.4.7.3 Criteria for assessable development (part)
 Performance outcomes                         Acceptable Outcomes                          Compliance Response
                                                                                             //NA
 Staged development
 PO17                                       No acceptable outcome provided                    N/A     PO17 not applicable
 Staged development is planned,                                                                       Civil engineering aspects are beyond the scope of
 designed and constructed to ensure                                                                   this traffic assessment.
 that—                                                                                                This development is not proposed to be staged.
(a)    each stage of the development
       can be constructed without
       interruption to services and
       utilities provided to the previous
       stages;

Log in to download the original (Appendix E- Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.