Appendix E- Traffic Impact Assessment · MCU23/0135
Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
10 October 2023
SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre Stage 2 Retail TIA 20231010.docx
Figure 8 I1: Hofmann Drive / Noosa Civic Access Road – Existing and SIDRA
Assessed Form
Table 20 I1: Hofmann Drive / Noosa Civic Access Road – SIDRA Outputs
Weekday PM Peak Saturday Midday Peak
Scenario Critical Delay 95%tile Critical Delay 95%tile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
Survey
2022 0.46 13 24 0.60 17 42
Baseline
2022 0.46 13 24 0.60 17 42
2027 0.53 14 31 0.67 19 56
2037 0.64 15 49 0.68 20 57
Baseline with Development
2027 0.57 15 37 0.69 18 55
2037 0.69 17 59 0.78 26 79
The results of the analysis summarised in Table 20 shows that the existing intersection form
is expected to perform within the adopted performance thresholds for all assessed scenarios.
9.4.2 I2: Hofmann Drive / Noosa Civic Loop Road
The Hofmann Drive / Noosa Civic Loop Road is an existing 3-leg roundabout intersection. The
existing layout and SIDRA assessed intersection form are shown on Figure 9 below. The
results of the SIDRA assessment are presented in Table 21 below. Detailed SIDRA outputs
are provided at Appendix E.
22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.