Appendix E- Traffic Impact Assessment · MCU23/0135

of 151

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                    10 October 2023
                                                                        SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd                     SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre                                        Stage 2 Retail TIA 20231010.docx


Figure 9    I2: Hofmann Drive / Noosa Civic Loop Road – Existing and SIDRA Assessed
            Form




Table 21 I2: Hofmann Drive / Noosa Civic Loop Road – SIDRA Outputs
                         Weekday PM Peak                         Saturday Midday Peak
Scenario                   Critical Delay    95%tile                Critical Delay    95%tile
                 DOS                                     DOS
                                (sec)       Queue (m)                    (sec)       Queue (m)
Survey
2022             0.34            14            16         0.35           14              17
Baseline
2022             0.34            14            16         0.35           14              17
2027             0.40            14            20         0.39           14              19
2037             0.50            14            28         0.40           14              20
Baseline with Development
2027             0.40            14            20         0.39           14              19
2037             0.50            14            28         0.40           14              20

The results of the analysis summarised in Table 21 shows that the existing intersection form
is expected to perform well within the adopted performance thresholds for all assessed
scenarios.

9.4.3      I3: Hofmann Drive / Rene Street / Loading Dock Access
The Hofmann Drive / Rene Street / Loading Dock Access is an existing roundabout
intersection. The existing layout and SIDRA assessed intersection form are shown on Figure
10 below. The results of the SIDRA assessment are presented in Table 22 below. Detailed
SIDRA outputs are provided at Appendix E.




                                                23

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E- Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.