Council archive · source document
DA20250050_DA Approval · 132010.574.01
2010/574
Plan No. Rev. Plan Name – Prepared by Date
Sheet 1 of 4 Lower Level Plan – Civic Steel Homes 24 March 2010
Sheet 2 of 4 Upper level Plan – Civic Steel Homes 24 March 2010
Sheet 3 of 4 Elevations – Civic Steel Homes 24 March 2010
Sheet 4 of 4 Elevations – Civic Steel Homes 24 March 2010
Relevant Period
2. The Development Permit for a material change of use lapses if the use has not happened by
31 May 2014, unless an application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storey.
4. A verification survey of the building shall be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum allowable building height as required by either the conditions of approval of the
Planning Scheme.
Security Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $10 000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Landscaping
6. The retaining wall shall not encroach into the southern boundary setback.
7. Existing trees on the site and within road reserves shall be retained, except where required to
be removed due to building operations or the conduct of the approved use. In this regard:
7.1. the mature Banksia integrifolia located near the front boundary shall be retained.
7.2. the small Banksia integrifolia located to the north west corner of the Lot and within the
setback shall be retained.
8. All vegetation shall be protected from interference resulting from clearing or construction
activities by:
8.1. Clearly marking the 2 Banksias to be retained with flagging tape;
8.2. Installing protective fencing around the drip line of the trees;
8.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with trees; and
8.4. Low impact construction techniques are used around trees to minimise interference with
the trees.
9. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
9.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
9.2. Disposal for firewood.
9.3. Disposal for landscaping purposes.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DA20250050_DA Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 59 KB (small file)
- File type
No other editions are linked here.