Skip to the record
For the highest quality transcripts.

Council archive · source document

DA20250050_DA Approval · 132010.574.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2010/574




General – Operational Works Assessment Branch
20.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
21.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
22.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Contributions
23.   The applicant must pay contributions towards trunk infrastructure in accordance with the
      following Planning Scheme Policies and Council Policies:
      (a)    Planning Scheme Policy 12 – Public Open Space Contributions;
      (b)    Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
      (c)    Planning Scheme Policy 16 – Sewerage Headworks Contributions;
      (d)    Planning Scheme Policy 17 – Water Supply Headworks Contributions;
      (e)    Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
      (f)    Council Policy – Rural Roadworks Contributions;
      (g)    Council Policy – Master Drainage Contributions.
      For material change of use of premises approvals the contributions must be paid prior to the
      commencement of use, for reconfiguring a lot approval contributions must be paid prior to
      Council approval of the plan of subdivision.
      The actual amount of the contribution must be calculated and paid in accordance with the
      Planning Scheme Policies and variations due to indexation current at the time of payment.

5     REFERRAL AGENCY CONDITIONS
Not applicable.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:

 Plan No.                    Rev.    Plan Name – Prepared by                      Date
 Sheet 1 of 4                        Lower Level Plan – Civic Steel Homes         24 March 2010
 Sheet 2 of 4                        Upper level Plan – Civic Steel Homes         24 March 2010
 Sheet 3 of 4                        Elevations – Civic Steel Homes               24 March 2010
 Sheet 4 of 4                        Elevations – Civic Steel Homes               24 March 2010

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:
      1.1.   On a Sunday or public holiday, at any time; or
                                                                                     Page 4 of 8

Used in these records

About this file

File size
59 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DA20250050_DA Approval.pdf · 59 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.