Attached to the e-mail 132006.1395.04 Request for Extension of Relevant Period.
KHA DEVELOPMENT MANAGERS Page 8
Natural Hazard: Bushfire & Acid Sulfate Soils Overlay
The site is subject to the Natural Hazard:
Bushfire & Acid Sulfate Soils Overlay,
which includes the land within a medium
bushfire hazard area and high potential
acid sulfate area.
The matters identified by this overlay
have been addressed as part of the
development application associated with
the current Development Permit for
material change of use (Attachment 1 &
section 5 below). The Development
Permit establishes that this overlay does
not pose any constraints to site
development.
A copy of the Bushfire Management Plan
prepared by The Consultancy Bureau and
assessed by Council is included in
Attachment 6. This report concludes
the site is not subject to any bushfire
risk.
A copy of the Acid Sulfate Soils report
prepared by Environmental & Earth
Sciences is included in Attachment 7.
This report concludes the site is not
subject to acid sulfate soils.
5. CURRENT DEVELOPMENT APPROVAL
The site has a current Development Permit for Material Change of Use for a Multiple Dwelling
comprising 10 x 3 bedroom units. This permit was originally granted by Negotiated Decision
Notice on 15 May 2008. A Change to an Existing Approval was granted by Council on 14 July
2008 (Attachment 1), which amongst other things extended the relevant period until 12 May
2012. A further extension to the relevant period was approved by Court judgment on 5 July
2013 (Attachment 8) extending the relevant period until 15 May 2016.
The approved plans (Attachment 1) are conceptual only with detailed plans required to be
lodged with Council prior to the issue of a development permit for operational works
demonstrating compliance with the requirements of condition 2.
Referenced documents within the conditions of approval include:
Ecological Assessment Report prepared by Biological and Environmental Services
(Attachment 5)
Access driveway location, Fig 2.1 dated 13 June 2007 prepared by Callaghan & Toth and
plan dated 12 October 1999 prepared by Ken Hicks and Associates (Attachment 9)
Stormwater Quality Management & Assessment Report dated June 2007 prepared by
Callaghan & Toth (Attachment 10)
Deed made 22 December 1999 between Noosa Council, Aqua Blue (Noosa) Pty Ltd and
Johanna Thannhauser (Attachment 3)
Water supply plan H-SP-02 dated 2 December 2007 prepared by Brian Burnett &
Associates for the Aqua Blue Noosa Sanctuary Development.
While not referenced in the approval, a Noise Report was prepared by TTM Consulting and
submitted with the application (Attachment 11). This report provides recommendations for
11437 – 142 NOOSA DRIVE, NOOSA HEADS – PLANNING ADVICE SEPTEMBER 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Advert package.pdfRelated documentApplication case desk ↗
Attachment A - Advert package.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.