Attachment A - Advert package · 132006.1395.04
Attached to the e-mail 132006.1395.04 Request for Extension of Relevant Period.
KHA DEVELOPMENT MANAGERS Page 9
acoustic attenuation for the approved development and which may assist in compliance with
conditions 18 and 20.
6. DEVELOPMENT CONTRIBUTIONS
Under the current development permit (Attachment 1 - condition 66 and advisory note 2) and
court judgment (attachment 8) the following charges are applicable (subject to CPI
adjustment at time of payment):
Sewerage Headworks Contribution $25,204 (as at Jan 2008)
Water Supply Headworks Contribution $36,670 (as at Jan 2008)
Pathway Trunk Network Contribution $6,685 (as at Jan 2008)
Coastal Major Road Network Contribution $18,997 (as at Jan 2008)
Stormwater Network Contribution $15,753 (as at July 2013)
$103,309 (subject to CPI adjustment)
This $103,309 represents a substantial saving from the charges that would be applicable
under Councils Adopted Infrastructure Charges Resolution and which would be applied to any
new development approval, which for 10 x 3 bedroom units would be about $270,000
(subject to CPI adjustment).
Development contributions are payable prior to commencement of use.
7. INFRASTRUCTURE SERVICING
Site servicing requirements are detailed in the conditions of the current development
approval. In particular the site is to be connected to the sewer reticulation system within the
adjoining RACV Noosa Resort development (previously Aqua Blue Noosa Sanctuary), with all
sewage to drain by means of gravity to the sewage pump station located on Lot 2 SP110327
as per the Deed made on 22 December 1999 between Noosa Council, Aqua Blue (Noosa) Pty
Ltd and Johanna Thannhauser (Attachment 3). It is our understanding that all obligations in
terms of construction by Aqua Blue Noosa Sanctuary/RACV Noosa Resort and $20,000
contribution towards the sewage pump station and sewer pipeline by owner Johanna
Thannhauser have been completed.
8. SUMMARY
The following attributes of the site have been established during the development application
process, as referred to above and detailed in the 14 July 2008 Development Permit, approved
plans and supporting documents attached.
Approval for 10 x 3 bedroom units, allowing a maximum gross floor area of 1896m 2, a
site cover of 40% and maximum height of 2 storeys and 8m.
A development entitlement that establishes that the applicable overlays under the current
planning scheme outlined above do not pose any constraints, with any required actions or
works identified as conditions.
Development contributions under the approval of $103,309 (subject to CPI adjustment)
which represents a substantial saving from the charges that would be applicable under
Council’s Adopted Infrastructure Charges Resolution and which would be applied to any
new development approval, which for 10 x 3 bedroom units would be about $270,000
(subject to CPI adjustment).
Road access is completed.
Existing right to connect all dwellings to the sewer reticulation system of the adjoining
property: a new sewage pump will not have to be built for the site.
11437 – 142 NOOSA DRIVE, NOOSA HEADS – PLANNING ADVICE SEPTEMBER 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Advert package.pdfRelated documentApplication case desk ↗
Attachment A - Advert package.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.