NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22 · MCU22/0038

of 48

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (19.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                        a.      1 ambulance space; and
                        b.      1 SRV space.
                        Pedestrian and Bicycle Facilities
                 56.    Pedestrian and bicycle facilities must be provided for the development. The works must
                        be undertaken in accordance with an Operational Works approval and must include in
                        particular:
                        a.      a 2 metre wide concrete footpath within the road verge for the entire length of the
                                site’s frontage to Hoffman Drive and the internal service road;
                        b.      signage and lighting at strategic locations to direct people to building entries and
                                public toilet facilities;
                        c.      a total of 16 bicycle parking spaces; and
                        d.      end of trip facilities involving 8 lockers, 2 male and female showers and change
                                rooms within the development.
                        Water Quality
                 57.    A stormwater quality treatment system must be provided for the development. The works
                        must be undertaken in accordance with an Operational Works approval and the latest
                        version of the Water Sensitive Urban Design Technical Design Guidelines for South East
                        Queensland, and must include in particular:
                        a.      stormwater quality treatment devices of a size and location generally in
                                accordance with those shown in Stormwater Management Plan, prepared by MPN
                                Consulting, dated 27th June 2022;
                        b.      bioretention devices which:
                                i.     demonstrate that Bio basin 1 is able to gravity drain to the existing
                                       stormwater infrastructure on site. The outlet pipe grade must be a minimum
                                       of 0.5% to ensure the bio basin is free draining.
                                i.     are designed generally in accordance with the Bioretention Technical Design
                                       Guidelines (Water by Design, 2012)
                                ii.    are designed, where applicable, generally in accordance with IPWEQA
                                       Standard Drawing No. DS-073, DS-075, DS-076, and DS-078
                                iii.   are provided with a free-draining outlet from the sub-soil drainage system
                 58.    A maintenance manual is required to be prepared for the stormwater quality treatment
                        devices, rainwater tanks and basement pump out system for the development. This
                        manual is to be submitted to Council at Operational Works stage for review.
                 59.    Permanent educational signage must be erected to educate the residents of the
                        development about the function of the bioretention device(s). The dimensions,
                        standard, presentation and location of the educational signage must be in accordance
                        with an Operational Works approval.
                 60.    All stormwater quality treatment devices must be maintained in accordance with the
                        Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
                        approved Operational Works drawings for the stormwater quality treatment system and
                        detailed life cycle costing of the system must be attached as an addendum to this
                        document. Records of all maintenance activities undertaken must be kept and made
                        available to Council upon request.




                                                                                                          Page 7 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022

Used in these records

About this file

File size
19.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.