61. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
and must include the full cost of maintaining the system in accordance with Water by
Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of
maintaining the system must be included in the proposed levies for each unit owner.
Stormwater Drainage
62. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. the detention system generally as described in Stormwater Management Plan,
prepared by MPN Consulting, dated 27th June 2022;
b. the use of gravity stormwater drainage and not surcharge pits to the maximum
extent practicable. Surcharge pits may only be used where the catchment is
composed of roof surfaces only;
c. provision of rainwater tanks for the capture and reuse of roof water for the irrigation
of communal landscaping; and
d. accommodation for both severe storms or severe blockage of the underground
drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
system proposed for the site is to be provided with the development application
for operational works, and is to demonstrate that finished floor levels will not be
inundated under either a severe blockage of the underground drainage network in
the 1%AEP event at year 2100, or for a severe storm exceeding the 1%AEP based
on design blockage.
Acid Sulfate Soils
63. An Acid Sulfate Soil Management Plan must be prepared and submitted with the
Operational Works application for the site. The acid sulfate management plan must
include testing, monitoring and treatment requirements for the works.
Services
64. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
65. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
66. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
67. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
68. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 8 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.