                 61.    Any proposed Community Management Statement required for the development must
                        include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
                        and must include the full cost of maintaining the system in accordance with Water by
                        Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of
                        maintaining the system must be included in the proposed levies for each unit owner.
                        Stormwater Drainage
                 62.    The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge. The works must be undertaken in accordance with an Operational
                        Works approval and the Queensland Urban Drainage Manual, and must include in
                        particular:
                        a.      the detention system generally as described in Stormwater Management Plan,
                                prepared by MPN Consulting, dated 27th June 2022;
                        b.      the use of gravity stormwater drainage and not surcharge pits to the maximum
                                extent practicable. Surcharge pits may only be used where the catchment is
                                composed of roof surfaces only;
                        c.      provision of rainwater tanks for the capture and reuse of roof water for the irrigation
                                of communal landscaping; and
                        d.      accommodation for both severe storms or severe blockage of the underground
                                drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
                                system proposed for the site is to be provided with the development application
                                for operational works, and is to demonstrate that finished floor levels will not be
                                inundated under either a severe blockage of the underground drainage network in
                                the 1%AEP event at year 2100, or for a severe storm exceeding the 1%AEP based
                                on design blockage.
                        Acid Sulfate Soils
                 63.    An Acid Sulfate Soil Management Plan must be prepared and submitted with the
                        Operational Works application for the site. The acid sulfate management plan must
                        include testing, monitoring and treatment requirements for the works.
                        Services
                 64.    Unless otherwise stipulated by telecommunications legislation at the time of
                        construction, the development must be provided with all necessary conduits, pits and
                        pipes to accommodate the future connection of optic fibre technology
                        telecommunications.
                 65.    Certification must be submitted to Council from all relevant service providers (Energex,
                        NBN and Unitywater which certifies that the development has met the requirements of
                        this Decision Notice and all applicable legislation at the time of construction.
                        Easements
                 66.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                        party infrastructure located on the subject site must be placed within an easement
                        registered against the title of the property.
                 67.    All easements must be designed in accordance with the planning scheme and granted
                        at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                        easement documentation must be in accordance with the Grantee’s standard easement
                        terms. Draft easement documentation must be submitted to Council for endorsement.
                 68.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.




                                                                                                            Page 8 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022

Used in these records

About this file

File size
19.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.