RFI - Stormwater Management Plan

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1.0    INTRODUCTION

This report was lodged in support of a Change application to Noosa Council
by Calile Malouf Investments seeking to develop a hotel at Lots 10 and 11
SP195871, Serenity Close, Noosa Heads.

This Revision B proposes significant changes to management of external
catchment flows. Such changes address Council’s RFI dated 2nd December
2022 and subsequent discussions with Council officers.

The proposed development follows four stages of residential unit buildings
developed by Cape Bouvard over the greater Settlers Cove site with Alta
Projects’ Engineers having completed stormwater design, inspection and
certification for all previous stages.

Design solutions presented in this report are consistent with those previously
adopted with minor refinements borne of experience.



2.0    EXISTING CONDITIONS

The subject site is currently undeveloped and supports vegetation subject to
assessment and recommendations by the Ecological Consultant.

The site falls at moderate grades away from Serenity Close towards an
existing concrete pedestrian path with informal natural wetlands areas to the
south.

The entire site consists of loose, poorly graded dune sand and as such
contains no defined overland drainage paths since rainwater infiltrates
directly through the permeable surface.

Stormwater and sewer lines within Easements R, S and F roughly bisect the
site adjacent the existing boundary between lots 10 and 11.

In order to make way for the proposed building footprint, the existing sewer
will need to be relocated to the Serenity Close Road Reserve as per Unity
Water’s SAN Notice at Appendix H.

Architectural changes made in response to planning matters now provide a
viable alignment for a relocated stormwater line and emergency overland
flow path westward along the northern face of the proposed building and
discharging to the Serenity Close cul-de-sac head.
__________________________________________________________________________

A6769/22/SWMP/RevB – June
2023                                                                         Page 1 of 9
SH/PL
                       Brah101 Pty Ltd t/as ALTA PROJECTS
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.