Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

RFI - Stormwater Management Plan

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Lots 10 and 11 are proposed to be amalgamated as part of the development.

Refer detail survey at Appendix F.



3.0    PROPOSED DEVELOPMENT

The proposed development consists of multi storey hotel buildings with
basement carparking underneath and all buildings to be surrounded by
extensive landscape areas, both hard and soft.

Guests’ vehicular entry to basements will be from Banksia Avenue while
service vehicles will access back of house areas via the cul-de-sac bowl at the
end of Serenity Close.

Revised architectural layouts will not require the existing concrete footpath at
the eastern end of Serenity Close to be extended westwards and hence the
existing grassed swale may be reinstated at completion of sewer realignment
works.




4.0    STORMWATER TREATMENT & DISPOSAL – DEVELOPMENT
       SITE

Treatment and disposal of runoff from the subject site will be carried out in
accordance with the approved document Settlers Cove Noosa Residential High
Density (RHD) Environmental Management Plan (EMP 1) by WBM Oceanics
Australia.

Alta Projects Engineers (formally TATE) were involved in formulation of the
overarching development approval document and EMP1 produced by WBM
Oceanics.

EMP1 recognises in particular the regimes of stormwater runoff and
infiltration which existed over the broader RHD site pre-development.

Essentially it was recognised that the RHD site lies atop a dune of poorly
graded sand with particularly high rainfall infiltration rates. As such the
natural state sees rainfall infiltrate the dune close to where it lands and
replenish the water table below with little or no runoff.

__________________________________________________________________________

A6769/22/SWMP/RevB – June
2023                                                                         Page 2 of 9
SH/PL
                       Brah101 Pty Ltd t/as ALTA PROJECTS
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.