RFI - Stormwater Management Plan

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 27, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
              STORMWATER MANAGEMENT AND MAINTENANCE PLAN
ELEMENT:                         MAINTENANCE OF RAPID INFILTRATION PITS (RIP’s)

1.     Objective                 To ensure ongoing function of RIP’s in reintroducing
                                 runoff into the subsoil and prevent surcharge/flooding.
       Consequences of Failure   Damage to POSCW areas
2.     Management Strategy       RIP internal surface to remain free of silt/sediment build-
                                 ups.

                                 RIP grates to remain clear and free of debris or blockages.
3.     Actions                   Maintenance Contractor to be issued with laminated
                                 copies of final ALTA Projects drawings A6769/22/PD01
                                 to PD05 for reference.

                                 Swales and RIP surface grates to be kept clear of any
                                 debris or blockages.

                                 Maintenance contractor with appropriate enclosed spaces
                                 qualifications and procedures in place to enter each RIP
                                 to inspect at quarterly intervals and after any event where
                                 more than 50mm of rain has fallen.

                                 Any debris, leaf litter etc accumulated in the RIP to be
                                 removed and disposed of lawfully.

                                 Upper BIDIM A14 filter layer to be inspected and if more
                                 than 50% covered in silt or mud replaced.

                                 Upper BIDIM A14 filter layer to be replaced annually.

                                 When replacing upper filter, the sand layer below to be
                                 inspected for discolouration and contamination and if
                                 present ALTA Projects to be notified for review and further
                                 advice.

                                 RIP walls and balance pipes to be inspected for any signs
                                 of cracking or degradation. If observed ALTA Projects to
                                 be notified.

                                 All removed filter layers, sand, sediment, silt to be
                                 disposed of lawfully.
4.     Performance Indicators    No surcharging of RIPs.
                                 No overflow from rock pitched weirs.
                                 No mponding of water in RIPs.
5.     Frequency/Deadline        Inspections after rain events or quarterly (whichever
                                 comes first)
7.     Reporting and Review      Maintenance Contractor to make entries in service diary.
                                 Site Owner to review service diary annually.

ELEMENT :                MAINTENANCE OF OVERLAND FLOW PATH and PIPEWORK

1.     Maintenance Objective     To ensure ongoing function of Overland Flow Path
       Consequences of Failure   And underground pipes
                                 Possible flooding of building during storm events.
2.     Management Strategy       Landscaped overland flow path to be maintained in good
                                 condition, clear and unblocked.
                                 Underground pipework to be maintained in good
                                 condition, clear and unblocked.

3.     Actions                   Maintenance Contractor to be issued with laminated
                                 copies of final ALTA Projects drawings.
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.