RFI - Stormwater Management Plan

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 28, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
ELEMENT :                  MAINTENANCE OF OVERLAND FLOW PATH and PIPEWORK

                                   Landscaped Overland Flow path to be maintained with
                                   grasses mown, ground covers pruned and clear of
                                   obstructions to stormwater flow.

                                   Stormwater pit covers to be lifted and pits inspected
                                   quarterly for sediment build up , blockages etc.

                                   CCTV survey of underground stormwater pipes to be
                                   carried out every five (5) years and reviewed for any signs
                                   of ponding, blockages, breakages, pipe degradation etc.
                                   Any problems identified to be referred to ALTA Projects
                                   for review and further advice.

                               Details of all inspections, observations, service activities
                               and remedial actions to be recorder in service diary at the
                               time of inspection/service.
4.     Performance Indicators  No blockage of Overland Flow Path.
                               No blockage or damage to underground pipes.
5.     Frequency/Deadline      Inspections and maintenance after heavy rain events or
                               quarterly (whichever comes first).
                               CCTV Pipes every 5 years.
6.     Responsible      Person Site Owner to appoint and direct Maintenance contractor.
       /Organisation
                               Site Owner to ensure maintenance schedule adhered to
                               and review service diary.


7.     Reporting and Review        Maintenance Contractor to make entries in service diary.
                                   Site Owner to review service diary annually.
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.