BALANCE 6/1 CATCHMENT AREA = 0.167Ha 35% - IMPERVIOUS PAVEMENT (C10 = 0.9) 65% - PERVIOUS DENSE-MEDIUM BUSHLAND WITH HIGH SOIL PERMEABILITY (C10 = 0.25) IMPERVIOUS PORTION CALC q10 = 226mm/hr*(0.167*0.35)*(1.0*0.9)*(1/360) = 0.033m3/s q100 = 332mm/hr*(0.167*0.35)*(1.2*0.9)*(1/360) = 0.054m3/s PERVIOUS PORTION CALC q10 = 226mm/hr*(0.167*0.65)*(1.0*0.25)*(1/360) = 0.017m3/s q100 = 332mm/hr*(0.167*0.65)*(1.2*0.25)*(1/360) = 0.030m3/s TOTAL CALC q10 = 0.05m3/s q100 = 0.084m3/s SERENITY CLOSE EX/10 CATCHMENT AREA = 0.1495Ha 90% - IMPERVIOUS PAVEMENT (C/10 = 0.88) q10 = 226mm/hr*0.1495*(1.0*0.88)*(1/360) = 0.082m3/s q100 = 332mm/hr*0.1495*(1.2*0.88 ADOPT 1)*(1/360) = 0.138m3/s SERENITY CLOSE 8/1 CATCHMENT AREA = 0.1304Ha 90% - IMPERVIOUS PAVEMENT (C/10 = 0.88) Q10 = 226mm/hr*0.1304*(1.0*0.88)*(1/360) = 0.072m3/s Q100 = 332mm/hr*0.1304*(1.2*0.88 ADOPT 1)*(1/360) = 0.12m3/s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.