RFI - Stormwater Management Plan

of 67

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

BALANCE 6/1

CATCHMENT AREA = 0.167Ha

35% - IMPERVIOUS PAVEMENT (C10 = 0.9)

65% - PERVIOUS DENSE-MEDIUM BUSHLAND WITH HIGH SOIL PERMEABILITY (C10 = 0.25)

IMPERVIOUS PORTION CALC
q10 = 226mm/hr*(0.167*0.35)*(1.0*0.9)*(1/360) = 0.033m3/s
q100 = 332mm/hr*(0.167*0.35)*(1.2*0.9)*(1/360) = 0.054m3/s

PERVIOUS PORTION CALC
q10 = 226mm/hr*(0.167*0.65)*(1.0*0.25)*(1/360) = 0.017m3/s
q100 = 332mm/hr*(0.167*0.65)*(1.2*0.25)*(1/360) = 0.030m3/s

TOTAL CALC
q10 = 0.05m3/s
q100 = 0.084m3/s

SERENITY CLOSE EX/10

CATCHMENT AREA = 0.1495Ha

90% - IMPERVIOUS PAVEMENT (C/10 = 0.88)

q10 = 226mm/hr*0.1495*(1.0*0.88)*(1/360) = 0.082m3/s

q100 = 332mm/hr*0.1495*(1.2*0.88 ADOPT 1)*(1/360) = 0.138m3/s

SERENITY CLOSE 8/1

CATCHMENT AREA = 0.1304Ha

90% - IMPERVIOUS PAVEMENT (C/10 = 0.88)

Q10 = 226mm/hr*0.1304*(1.0*0.88)*(1/360) = 0.072m3/s

Q100 = 332mm/hr*0.1304*(1.2*0.88 ADOPT 1)*(1/360) = 0.12m3/s
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.