Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

RFI - Stormwater Management Plan

of 67

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

NODE 03
CATCHMENTS: EXTERNAL UPSTREAM + VEGETATION AREA

Q100 = 1.248m3/s

Q10 = 0.836m3/s

GAP FLOW = 0.412m3/S



NODE 03 - Overland Flowpath 4m - BLOCK WALLS and VEGETATED BASE - FULL Q100
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.