Original source · versioned page text
RFI - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (13.7 MB): may take a few minutes to open.
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
NODE 03 CATCHMENTS: EXTERNAL UPSTREAM + VEGETATION AREA Q100 = 1.248m3/s Q10 = 0.836m3/s GAP FLOW = 0.412m3/S NODE 03 - Overland Flowpath 4m - BLOCK WALLS and VEGETATED BASE - FULL Q100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.