Original source · versioned page text
RFI - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (13.7 MB): may take a few minutes to open.
Original PDF page 40, section 1. The text section number identifies this passage in the reader.
NODE 03 - Overland Flowpath 4m - BLOCK WALLS and VEGETATED BASE - GAP FLOW
Trapazoid Channel
@
XN
aS
ks
050,09
05050
Enter x1-[___0.01](m)
Enter yt 4(m)
Enter w + 4}(m)
Enter x2-) _0.01}(m)
Enter y2 4(m)
Enter S 0.005|(m/m) (calculate only for length of channel)
Sect No n din d2n w a Pp ant.67 —_p4.667 q v
(m) (m) (m) (m2) (m) (m3/sec) (mvs)
1 C013] 0.000[_ 0210] 0.002 0.000 0210 0.000 0363 0.000 0.056
2 0.05] 0210 0.210 4.000 0.840 4.000 0748 2620 0.420 0.500
3 0.013] 0.210 0.000 += -0.002-» 0.000 «0.210 += 0.000 «0.353 0.000 -—i0.056
wj0042 © 0.8404 4.4200 OAT) m3/sec
DRAINAGE CHANNEL INVERT LEVEL (IL) {006130
ADJACENT FLOOR LEVEL (FFL) 17.25
FREEBOARD ACHIEVED (m)
0.740 GREATER THAN 0.3m
s Dxv
(mm) _(m2/s)
0.00500 0.012
0.00500 0.105 LESSITHANIOMma/s
0.00500 0.012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.