Original source · versioned page text
RFI - Stormwater Management Plan
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn RIPs have been installed on all of the Cape Bouvard Developments
within Settlers Cove and have proven to work very well.
Refer engineering drawings at Appendix A for RIP details.
4.2 RIP Infiltration Capacities (100 Year ARI events)
Alta Projects Engineers (formally TATE) were involved in formulation
of the over-arching development approval document and EMP1.
Such involvement included construction of a prototype RIP on the
Settlers Cove site and field testing to determine infiltration rates.
Results were consistent indicating a liner relationship between driving
head and infiltration rate such that:
Infiltration Rate (mm/s) = 4mm/sec + 13.6 x head (m)
Refer to Appendix C for prototype test results.
In order to model the operation of the RIP’s, a spreadsheet has been
developed and utilised for all previous stages of Settlers Cove.
Temporal patterns for Zone 3 from the Australian Rainfall and Runoff,
Volume 2 were applied. These temporal patterns were used in
conjunction with the average rainfall intensities for the Noosa region to
create a series of design storms of varying duration for a 100-year
average return interval (ARI).
Temporal patterns were converted to flow rates by breaking each
storm event into a series of short duration storms. A triangular flow
verses time approximation was used for each sub storm with sub storm
flows then added to produce flow Vs time for RIP inflow.
Outflow and water depth were then calculated through iterations for
the duration of the storm based on the infiltration rate / head
relationship discussed above. A factor of safety of 2.0 was applied to
the observed prototype infiltration rate. Each RIP was then sized to
prevent overtopping in a 100-year ARI storm event of any duration.
Spreadsheet model results for the proposed hotel buildings are
attached at Appendix E.
__________________________________________________________________________
A6769/22/SWMP/RevB – June
2023 Page 5 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.