RFI - Stormwater Management Plan
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn(RIPs) in order to achieve no net reduction in rainwater infiltration. Notably
this approach sees higher than required rainfall intensities infiltrated without
RIPs overtopping in order to limit emergency overflows to ecological
restoration areas. Such an approach has been adopted on all previous Cape
Bouvard developments in the area.
RIPs are to be located at the south-western corner of the site within a
vegetated swale lined with appropriately remediated soils for stormwater
treatment. Splitter pits will be employed directly upstream of the swale with 3
month ARI flows directed to the swale surface for treatment and larger flows
routed directly into the RIPs.
Driveway and carpark areas will be passed through a GPT/oil arrester to
remove oils and hydrocarbons prior to infiltration.
Main roofed areas from buildings will drain to Rainwater Harvesting Tanks
with captured runoff utilized for landscape irrigation. Tank overflow will be
directed to the vegetated swale/RIPs. Runoff from all roofs and hardstand
areas will be piped to the RIPs for flow up to 100 year ARI.
Runoff from main landscaped areas will be intercepted and treated via
landscaped swales prior to collection in pits and pipes and discharge to small
localised RIPs (exact locations to be determined at OpWorks stage).
Major event flows surcharging from the RIPs in the unlikely event of RIP
failure would be directed westward via a stone pitched weir toward
ecological restoration areas as dispersed sheet flow. The rough nature of the
stone pitching will also provide an “energy dissipation” effect.
4.1 Rapid Infiltration Pits (RIP’s)
RIPs consist of a bottomless stormwater pit which promotes infiltration
through its base.
Crushed rock and multiple layers of geofabric and “sacrificial sand”
are installed at the base of the RIP to protect against clogging of dune
sands below.
RIPs will be subject to routine inspection and maintenance by the
hotel’s maintenance team and such maintenance is critical to their
ongoing function.
(Refer Maintenance Schedule at Appendix C).
__________________________________________________________________________
A6769/22/SWMP/RevB – June
2023 Page 4 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.