RFI - Stormwater Management Plan

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.0    EXTERNAL CATCHMENTS

The eastern end of the Serenity Close roadway and the existing residential building at
the north-eastern corner of the site; Macquarie Lodge and Petrie Mansions were all
constructed by RF Thompson Developments during the 1990’s and early 2000’s
predating the Settlers Cove Noosa Residential High Density Environmental Management
Plan (EMP 1) produced by WBM Oceanics Australia.

As such the current best practice of rainwater infiltration was not adopted for those
early developments and instead stormwater was collected and conveyed to Noosa
Inlet via traditional methods including the existing stormwater line mentioned in
section 2.0 above.

Following on from discussions with Council officers it is now proposed that flows
from external catchments be re-routed through the development site on a revised
alignment but in a traditional fashion consisting of minor event flows conveyed
underground via piped drainage with a landscaped major event overland flow path
above.

Architectural changes made in response to planning matters now provide a viable
alignment for a relocated stormwater line and emergency overland flow path
westward along the northern face of the proposed building and discharging to the
Serenity Close cul-de-sac head.


       5.1 External Catchment Drainage Route

       The proposed route for minor event pipework and major event overland flow
       will follow the northern face of the building/southern extent of landscaped
       area in order to minimise impacts on large mature trees which may need to be
       preserved. A pipework alignment just 2m from the building would see
       shallow excavation works limited to a width of 4m for the landscaped channel
       base with a further maximum 5m for gentle landscaped batters.

       Whilst it is anticipated that safety concerns would generally preclude large
       trees from being preserved any closer than 10m or so from buildings discrete
       retaining walls could be utilised outside the 4m channel base should this prove
       not to be the case.

       Whilst an easement in favour of Council is proposed over the external
       catchment system, inspection and maintenance of the swale, pits and pipes
       would fall to the hotel operator.




________________________________________________________________________________________

A6769/22/SWMP/RevB – June 2023                                              Page 7 of 9
SH/PL
                       Brah101 Pty Ltd t/as ALTA PROJECTS
Log in to download the original file

RFI - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗