Original source · versioned page text
MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan
The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Civic
Stormwater Management Plan
Issue – Treatment Devices
The total size of water quality treatment devices shown on plans is not clear. The design must allow
sufficient space within the development footprint for the active filter media area in bioretention
basins. The active filter media area does not incorporate batters, inlet scour protection and overflow
devices.
Information Required
52 Provide legible scaled plans that demonstrate adequate footprint is provided to facilitate the
required active filter media area within bioretention basins along with sufficient footprint for
other aspects of the water quality improvement devices, such as batters, inlet scour
protection, etc.
A copy of the concept plans are included in Appendix E.
Issue – Legal Point of Discharge
It is unclear how waters treated within proposed bioretention basins will drain to a legal point of
discharge or where this discharge point will be. There is concern that the underdrainage pipes will
be lower than the invert of the receiving drainage lines.
Information Required
53 Provide a preliminary drainage plan for flows into and out of water quality treatment devices.
Demonstrate outlets can all be contained within the site.
A copy of the concept plans are included in Appendix E.
Issue – Environmental Protection Act
The scale of the development in terms of roof and hardstand area exceeds that anticipated by
current Noosa Plan. In addition to ensuring developments achieve the Water Quality Reduction
targets under the State Development Assessment provisions, Council must ensure that any changes
inconsistent with the Noosa Plan are consistent with the objectives of the Environmental Protection
Act.
The Environmental Protection Act and subordinate legislation calls for Planning Schemes (or other
stormwater management documents) to ensure that water quality objectives in the receiving
environment can achieve ongoing compliance with the document titled “Environmental Protection
(Water) Policy 2009 Noosa River environmental values and water quality objectives Basin No. 140
(part), including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba, Doonella and
Weyba July 2010.”
The development is proposed within a catchment that is already heavily developed and the
ecological processes within the receiving waters are expected to have minimal buffering capacity to
withstand additional physiochemical changes.
eSource Catchment software is able to model the status of a catchment and predict the quality of
receiving waters.
Information Required
54 Please provide an eSource catchment model for the entire catchment that drains to the
receiving waters of Eenie Creek. The eSource Catchment Model must presume a fully
developed catchment consistent with the Noosa Plan together with the subject application.
The eSource catchment model must demonstrate that the development, including proposed
water quality mitigation devices, will not diminish the ability of Eenie Creek to achieve the
relevant water quality objectives required by the Environmental Protection (Water) Policy
2009 Noosa River environmental values and water quality objectives Basin No. 140 (part),
including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba, Doonella
and Weyba July 2010.
QIC Noosa Civic Pty Ltd Version Final 11 May 2015
J13041R2_Final SWMP.docx Commercial in Confidence Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.