Original source · versioned page text
MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan
The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Civic Stormwater Management Plan This information request was discussed with Council (Pers Comm Cherie O’Sullivan 6 March 2015). Ms O'Sullivan indicated that the information request was based on the belief that the proposed scale of development exceeded that provided for in the Noosa Plan. On this basis, additional modelling was requested utilising eWater’s Source modelling tool. Ms O'Sullivan also indicated that Council is currently developing a Source model for the catchment in question, but that this model would not be completed for 6 months. A copy of the Shire Business Centre Map from the Noosa Plan, including the site, is shown below. QIC Noosa Civic Pty Ltd Version Final 11 May 2015 J13041R2_Final SWMP.docx Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.