Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Civic
Stormwater Management Plan




5                Conclusion
A Stormwater Management Plan has been prepared to support the Noosa Civic expansion. The key findings
of the investigation are detailed below.
         Regional Flooding
           The Regional flood and storm tide mapping indicates that the proposed development will be above
           the regional flood events.
         Stormwater Quantity
           The proposed development is predicted to increase the peak stormwater discharges from the site.
           Mitigation measures as shown in Figure 3 include:
             - Utilising storage in the car parks to a maximum depth of 300mm. For the purposes of the
               development application assessment, the levels were based on the preliminary engineering
               levels.
             - Reducing the capacity of the culverts under Hofmann Road to 4/1200x300 and raising the invert
               level from 3.05mAHD to 3.35mAHD whilst maintaining a 225 RCP at the original invert level for
               low flows; and
             - Utilizing the fauna passage as a discharge point for events above a 5 year ARI.
           Based on the analysis, the mitigation strategy is predicted to reduce the peak flows to existing
           conditions therefore causing no adverse flooding external to the site.
         Stormwater Quality
           It will be necessary to treat runoff from the site to satisfy the water quality objectives defined by the
           State Planning Policy (DSDIP, 2013) and Noosa Shire Council. The proposed mitigation measures
           were found to satisfy the applicable water quality objectives.
Given the results obtained with respect to stormwater quality and quantity, it is considered that the site can
be developed from a stormwater management perspective without producing unacceptable impacts.




QIC Noosa Civic Pty Ltd                             Version Final                                        11 May 2015
J13041R2_Final SWMP.docx                        Commercial in Confidence                                     Page 15
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix E - Stormwater Management Plan.pdf · 26.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.