Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Civic
Stormwater Management Plan




6                Qualifications
This report was prepared by Cardno for QIC Noosa Civic Pty Ltd and specifically to provide acceptable
stormwater management strategies for the proposed extension of the Noosa Civic development.
The analysis and overall approach was specifically catered for the particular requirements of QIC Noosa
Civic Pty Ltd, and may not be applicable beyond this scope. For this reason any other third parties are not
authorised to utilise this report without further input and advice from Cardno.
The report is based on the following information provided by others:
    Aerial Laser Survey (ALS) (supplied by Department of Natural Resources & Mines, Qld);
    Ground survey (completed by Bennett and Francis Pty Ltd);
    Development layouts (completed by The Buchan Group); and
    Engineering plans (completed by Cardno).
The accuracy of the report is dependent upon the accuracy of this information.
Whilst this report accurately assesses catchment hydrologic and water quality performance, using industry
standard theoretical modelling techniques and engineering practices, actual future observed catchment
flows, levels and extent of inundation may vary from predicted. It is for this reason that flood freeboards are
adopted.
Pollutant assessments, provided in this report, have been based on published typical land use parameters
and are therefore indicative only.




QIC Noosa Civic Pty Ltd                         Version Final                                       11 May 2015
J13041R2_Final SWMP.docx                    Commercial in Confidence                                    Page 16
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix E - Stormwater Management Plan.pdf · 26.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.