Skip to the record
Search everything, all in one place.

Original source · versioned page text

Appendix B - IWMP_2PearsonsRd_REV0

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                 Callaghan & Toth

4.4      TREATMENT DEVICES DESIGN DETAILS

Below in Table 4.3 are general design details for stormwater treatment systems.


TABLE 4.3: Design Features of Stormwater Treatment Systems

                Filter      Overall                    Total   Filter                   Extended
                                      Length   Width                    Transition
SYSTEM          S.A.         S.A.                      Depth   Depth                    Detention
                                       (m)      (m)                     Layers (m)
                (m2)         (m2)                       (m)     (m)                     Depth (m)

Bio Basin        200         450       22.5     9       0.9     0.4        0.3              0.2




                                                                                                  16
2035 2 Pearsons Road IWMP                                                  September 2020
Log in to download the original file

Appendix B - IWMP_2PearsonsRd_REV0.pdf · 4.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.