Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Assessment Report

Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Project Urban – 15228                                                                               June 2016




4.0 PROPOSED DEVELOPMENT
This application seeks a Development Permit for Reconfiguring a Lot (1 lot into 11 lots) to be established in
accordance with the accompanying Reconfiguration Proposal Plan.

The subject site is proposed to be subdivided into 11 low density residential allotments. Lot sizes vary from
601m² to 4,249m². All lots comply with the minimum lot size specified by Table 14-68 of the Reconfiguring
a Lot code.

The proposed development layout has been sensitively designed to avoid lot boundaries traversing riparian
buffer vegetation to be retained along the sites eastern boundary. The riparian buffer vegetation will be
retained within proposed Lot 9, which will also retain the existing house.

Road access to all 11 proposed lots will be facilitated by a 115m (approx.) extension to Elkhorn Drive.
Elkhorn Drive does not currently have a turnaround facility at the end of the existing cul-de-sac. The
development provides a single movement turning head at the end of the proposed road extension
resulting in an improvement to the existing situation by providing a turnaround facility suitable for local
traffic and waste collection vehicles. The attached traffic engineering advice prepared by Pekol Traffic and
Transport has found that the proposed development and road extension is suitable in terms of safety,
amenity, convenience and road capacity.

The development site is connected to all essential urban infrastructures. Internal infrastructure connections
to each lot will be subject to subsequent engineering design. Stormwater management for the site can be
achieved in accordance with the attached Stormwater management plan prepared by Empire Engineering.




Development Assessment Report                                                                     Page 8 of 24
Reconfiguration of a Lot
28 Elkhorn Drive, Tewantin
Log in to download the original file

Development Assessment Report.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.