Negotiated Decision Notice - Advice Agency - DPI - 010.2006.00001395.001 [As Published] · 132006.1395
-8-
Stormwater Drainage
48. Stormwater drainage shall be constructed generally in accordance with the report entitled
“Stormwater Quality Management and Assessment Report” June 2007 by Callaghan and Toth.
49. Final plans of the drainage design shall be prepared by a Registered Professional Civil
Engineer and submitted to Council prior to obtaining a Development Permit for Operational
Works.
50. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site.
51. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
(minimum storage 3000 litres per dwelling/unit ) that is installed to ensure water from the tank
can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
internal to the dwelling/building. All rainwater tanks are to be designed and installed in
accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and
shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be clearly shown on the plans submitted for Building
Works approval.
52. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors, which shall be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
53. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
54. The site shall be connected to the Noosa Sanctuary Development sewer reticulation system
and be constructed in accordance with Council’s standards and requirements at no cost to
Council.
55. All sewage shall drainage by means of gravity to the sewage pump station located on lot 2
SP110327 as per the Deed made on 22 December 1999 between Noosa Council, Aqua Blue
(Noosa) Pty Ltd and the applicant, Johanna Jacoba Thannhauser.
56. Should the drainage via gravity not be possible a new arrangement will need to be negotiated
with Noosa Council
57. The sewer system is to be kept and maintained in a condition suitable for use and shall not
cause adverse impacts on the environment.
8 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - Advice Agency - DPI - 010.2006.00001395.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 154 KB (small file)
- File type
No other editions are linked here.