Attachment 3 - Current TPC 1724 Quamby Place Approval · 51985.3785.05

Attached to the e-mail Change to DA - 51985.3785.05 (TPC 1724).

of 5

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

188/99 /Admin Marduk 2

3.

10.

Provision of at least twenty-nine (29) off-street car parking
spaces, comprising 28 covered spaces and 1 uncovered space, and
access thereto which are to be provided with a sealed pavement
and designed, drained, constructed and maintained in accordance
with the Town Planning Scheme, Council's Policies and to the
reasonable satisfaction of the Shire Engineer. Plans and
specifications for these works are to be submitted to the Shire
Engineer for approval in conjunction with the Building
Application. Note that car park 14 is not approved and that
there are two spaces numbered 27.

There is to be no detrimental effect upon the amenity of the
neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.

The open space and setback areas are to be landscaped in
accordance with the Noosa Design Manual and a properly prepared
landscaping plan to be submitted to and approved by the Shire
Planner, prior to the issue of a Building Approval. Such
landscaping is to be completed in accordance with the approved
landscaping plan, prior to the premises being occupied and
maintained at all times thereafter to the reasonable satisfaction
of the Shire Planner.

Construction work is permitted only during the hours of 7.00 a.m.
to 6.00 p.m. Monday to Saturday and no construction work is
permitted on public holidays, except where extended hours are
approved by the Building Surveyor.

Any advertising sign or device is to comply with the provisions
of the Noosa Design Manual.

Payment of contributions in accordance with Council's Policy on
Water Supply and Sewerage Headworks, current at the time of
Building Approval. If payment is not proposed to be made prior to
the issue of Building Approval, a cash bond or trading bank
guarantee for the required amount is to be lodged prior to the
release of that Approval. The contribution is then required to
be made within fourteen (14) days of the issue of Building
Approval.

The footpath across the frontage of the site is to be upgraded by
the provision of a 1.2 metres wide concrete footpath, which is to
be generally located 0.9 metres from the property alignment in
conjunction with general upgrading involving the forming,
grassing and topsoiling to the satisfaction of the Shire
Engineer.

The developer shall bear the cost of alteration of any public
utility or facilities necessitated by the development of the land
or associated construction works external to the site.

Used in these records

About this file

File size
334 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Current TPC 1724 Quamby Place Approval.pdf · 334 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.