Approved Plans MCU22-0080

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 STORMWATER QUANTITY

     3.1. Pre-Post Comparison
As the development proposes to increase the impervious area of the site by approximately 233.9m² (from 169.3m²
to 295.8m²), there is likely to be an increase in peak flows from the site. The site has therefore been modelled using
the DRAINS software to assess the impact on peak flows, comparing the existing site conditions to the proposed
development.

In accordance with ARR2019, an Initial Loss-Continuing Loss (IL-CL) model has been used to assess the site against
the ensemble of storm temporal patterns for the East Coast North region. The loss parameters and temporal patterns
have been imported from the ARR Datahub, and rainfall intensities have been imported from the Bureau of
Meteorology IFD rainfall data allowing for a 20% increase to rainfall depths to account for future climate change
patterns.

The parameters obtained from the Australian Rainfall and Runoff (ARR) Data Hub for the location and the rainfall
IFD data obtained from the Bureau of Meteorology have been imported into Drains to generate the storm events.
The models have been run using the ensemble of storm events for 1EY, 50%, 0.2EY, 10%, 5%, 2% and 1% Annual
Exceedance Probability (AEP) for durations from 1 minutes to 24 hours to determine the critical storm duration and
the mean peak flowrate from the storms. Refer to Appendix B DRAINS Modelling Parameters and Results for details
of the parameters used and summary of the results from the modelling.

The configuration of the catchment areas for pre-development and post-development scenarios are shown in Figure
3.1 – DRAINS Pre-development catchment and Figure 3.2 – DRAINS Post-development catchments respectively.




                                            Figure 3.1 – DRAINS Pre-development catchment




                                           Figure 3.2 – DRAINS Post-development catchments



Project number 20220072
File RECOR Preliminary Stormwater Management Report - 20220072.docx, 2022-09-02                                Page 7 of 14
Revision 1


P +61 7 5211 1003                          A 75 Noosa Dr, Noosa Heads Qld 4567    E [email protected]    recorconsulting.com
Log in to download the original file

Approved Plans MCU22-0080.pdf · 11.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗