Total progress to date
Table 1a presents a summary of the delivery against milestones. Table 1b. presents this information in detail. The
project milestones as per the Partnership Agreement are described in Annex 1.
Table 1a: Total Progress to Date
# Deliverable Progress
1.1 1 Technical Advisory Group with TOR established Achieved
1.2 1 Project Manager appointed Achieved
1.3 1 Project Implementation Plan completed and endorsed by Noosa Council Achieved
1 Detailed Risk Assessment included
1 Communications and Media Plan completed
1 Monitoring, Evaluation and Reporting Plan completed
1.4 3 community engagement forums facilitated Achieved
3 media statements released
1.5 3 six monthly status updates submitted to Noosa Council On Track
3 annual reports submitted to Noosa Council
2.1 1 Habitat suitability model developed which incorporates industry, Kabi Kabi and Achieved
public interests
2.2 1 set of ‘all’ relevant state and local permits for oyster reef restoration obtained Delayed
2.3 1 set of engagement records provided to Noosa Council of public and stakeholder Achieved
consultations, including one-on-one meetings, open forums, media, etc.
3.1 1 consultation completed Achieved
1 volunteering opportunities identified
3.2 1 volunteering program defined Achieved
1 volunteering program implemented
4.1 1 approval from Noosa Council secured to restore 2 trial restoration sites Delayed
2+ sites recovered with at least overall 80 m shore length of reef constructed
4.2 1 approval from Noosa Council secured to restore an additional 2+ sites Delayed
2+ additional sites recovered with at least an overall additional 600m 2 surface area
4.3 1 related reef monitoring program established Achieved
2 six monthly status reports submitted Delayed
2 annual monitoring and evaluation report cards produced and published
5.1 1 workshop facilitated Achieved
5.2 5 peer review reports submitted to Noosa Council during the three-year term of On Track
this Agreement, if requested by Noosa Council.
5.3 3 study tours facilitated during the three-year term of this Agreement, if requested On Hold
by Noosa Council.
5.4 1 Conservation Action Plan developed, as required On Track
1 set of Community Workshops facilitated, as required.
5.5 1 new formal networking connections facilitated to assist Noosa Council with On Track
ongoing and future marine conservation activities, as requested
5.6 1+ presentations given at national conference/s over 3 years On Track
1+ presentations given at international conference/s over 3 years
5.7 1+ New corporate/ government/ philanthropic alliances formed Achieved
1+ New in-kind support/financial funding contributions secured
5.8 1 Habitat mapping report, habitat suitability model, PhD study or similar output On Track
completed and presented to Noosa Council
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.