Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Response to Further Advice · MCU22/0139

of 4

Text shows just the words. Original shows the document exactly as it was published.

the roof terrace with a pergola and trellis that exceeds 7.5 metres and with a non-compliant setback to the side
boundary.

Information Required

6.     Revise the architectural plans that details the rooftop terrace setback a minimum of 2.5 metres from the
       side boundaries.

7.     Provide screening that is a minimum of 1.7 metres high and setback from the edge of the rooftop to
       ensure no overlooking.

8.     Provide revised architectural plans that remove the pergola, trellis or any structure that will add to the
       bulk at the roof level.

Response

In relation to Item 6, please see attached amended architectural plans (Rev 6), which clearly illustrates that
the building fully complies with setback requirements.

In relation to Item 7, the amended architectural plans (Rev 6), clearly illustrate that the height of screening
devices at the edge of the rooftop will be 1.7m in height to obscure overlooking. This can be a condition of
approval.

In relation to Item 8, as discussed during our telephone conversation the pergola is an open and lightweight
timber structure that will not incorporate a roof. Consequently, it will not have a bulky appearance and its
purpose is to provide shade to the rooftop area. Further, the shade structure is consistent with the overall
outcomes of the Sustainable Building Design Code which include that:
(a)     Development is located, designed, constructed and operated in accordance with best sustainable
        design principles.
(d)     Development includes passive design elements to respond to the local climate.
(f)     buildings are designed and constructed to be energy and water efficient.


Issue – Operational Works

The response to Councils information request included an amended Form 1 that detailed a change to the
application to include Operational Works. As discussed, fees are applicable for these Operational Works and it
was requested that a separate application for Operational works be lodged.

Information Required

9.     Please confirm how you wish the Operational works application be processed noting that additional
       fees are required.

Response

A separate operational works application has since been made and paid for.

Used in these records

About this file

File size
127 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Further Advice.pdf · 127 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.