Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
With Compliments
)'/O&, 4Pe
1 1 APR 2011
SCRC
Nambour
SCRC CORRESPONDENCE
60359986
www.tgmgroup.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 23 pages
Page 2
Us] JT ]r TZIl
TGM Group Pty. Ltd.
1315 Sturt Street
Ballarat VIC 3350
TGM
Engineers. Surveyors
Phone:
Facsimile:
03) 5330 8888
03) 5333 3815
Email: mail(aDtgmgroup corn
& Planners Web: tgmgroup.com
SUNSHINE REGIONAL
COUNCIL ATT: MARK LEWIS ATT:
Michael Carr Architect
ATT: Sho Itoh ATT:
Energex
ATT: Dan San Martin ATT:
McKnight Electrical
ATT: Wes McKnight ATT:
ATT ATT
FROM: G.MANSELL / P.NICOL
DOCUMENT REGISTER AND TRANSMITTAL
Project NamePROPOSED BUNNINGS WAREHOUSE Project Number : Sheet Number:
EUMUNDI-NOOSA ROAD, NOOSAVILLE, QLD. 4400-02-CE 1 of I
ENCLOSED ARE COPIES OF DOCUMENTS AS LISTED BELOW DATE OF ISSUE
Discipline : CIVIL Day 19 4 17j17 17 17 17 18 18 04 0404
Month 0102 02 02 03 03 03 03 03'04104 104
Year 11 11 11 11 11 11 11 11 11 11'11111
Issue No.
DOCUMENT REGISTER Drawing No. REVISIONS
General Notes, Drawing Index Standard Drawing Table 01 101.
PROPOSED INTFRNAL DRAINAGE AND PAVEMENTIAYOUT PLAN & PIT SCHEDULE C02 0 1 02102 04
Civil details Sheet C03 02' 03
General Notes & Drawing Index EC1 01 01
Proposed Roundabout Pavement Layout Plan _ EC2 01 01
Gateway Drive Cross Sections EC3 01 01
Eumundi East Cross Sections EC4 01 01
Eumundi West Cross Sections EC5 01 . 011
Kerb Setout Co-ordinates and levels EC6 01 01'
Overall Site Plan & Padmount Trans-former Site Plan E01 02 0202 03 03 03 03 03
Energex Specifications L 02 02 02 02 02 02 0202
Padrnount-Construct g €&3 01 ' 01 ' 01 02 02 02
Padmount Construction & Retaining Wall Details E03 03 03
Proposed carpark Dimensions Plan, Ramp Plan & Turning Templates D01 02
Proposed Roundabout Pavement Layout Plan RW1 01
Proposed Retaining Wall: East Boundary RW2 01
DISTRIBUTED TO NUMBER OF COPIES
SUNSHINE REGIONAL 1 1 1 4 4
Michael Carr Architect 1
Energex -- . . 1 1 1 1. 2.
McKnight Electrical 1 1 1,
SENT BY:
COJRIER 1.1 MAIL P PICKUP
:]'..R :1FS SFNGFR Y YOURMESSENGER E EMFJL E E E M E E E E E M E E M
REASON FOR ISSUE:
CR A."'QRO VAS FOR CONSTRUCTION P PRELIMINARY
7^'P.CER FORINFORMATION A A X X X X X X X A X X A
FORMAT
RXXXX aCAC'C XIXA HC Hard CWr FSFull Scale
LL -
`^ O g I V
S. H.1 S I1 D - OXF P - ADOBE PDF a d < = d Q. Q- = `^ d S
4400-02-CE Transmittal (Ball) 20th November 2008
Page 3
COUNCIL HOLD POINTS
E I CN'RA( TOP 15 TO 8E AWARE OF THE SUNSHINE (OAST
RL CARL COUNCIL CONSTRUCTION REQUIREMENTS AND CONTACT
11 SUNSHINE (OAST REGIONAL LCON(IL AT EA(" OF THEIR
*04 RECCRED HOLD POINTS TO ARRANGE APPROPRIATE TESTING AND,
INSPV IIONS
U SLB-GIUOE INSPECTION - NO (RUSHED ROCK OR OTHER
TGM
PAVEMENT MATERIAL IS TO BE PLACED UNTIL THE SUBGRADE
HAS BEEN INSPECTED AND APPROVED BY THE COUNCIL OFFICER.
TESL ROLLING - SHALL BE CARRIED OUT IN THE PROCESS OF
AND TO ME SATISFAi TION Of THE -DUN(R OFFICER.
PRIMER iOAf - COUNCIL OFFICER IS TO GIVE APPROVAL PRIOR to
THE PL A,EMFNT OF THE PRIMER COAT,
W BITUMINOUS IUNI. NI It WEARING COURSE - (PLACING AND
U CUMPM lI)N. NO I AVER SMALL Of SPREAD UNTIL THE COUNCIL
N
O
PROPOSED RUNNINGS WAREHOUSE 01/11(1/ DIMS ONvTNI TO PROCEED.
PLACING - COIN(RI II SHALL N))I BE PLACED UNTIL THE COUNCIL
OFFICER HAS EXAMINED( FORMWORK AND REIRIOR(LMENT IN PLACE
AND )IY[N HIS LONSINT TO PNKEED.
EUMUNDI-NOOSA ROAD, NOOSAVILLE, QLD.
FORMS - THE FORMS SHALL BE INSPILTEO BY THE COUNCIL
OFFICER IMMEDIATELY BEFORE (ON(RETI IS RISHED.
PREPARATION BEFORE PLACING FRESH CONCRETE - THE SURFACE
PIPEPARAIIONS WORK SHALL BE COMPLETED TO THE
SATISFACTION OF INC (DUN( It OFFICER BEFORE CONCRETING
PROCEEDS.
CARPARK & DRAINAGE WORKS BACKFALNG - NO IOINTS ARE TO BE COVERED OR TRENCHES
BALKYELED UNTIL PIKE LAYING HAS BEEN APROVED BY THE
(OUNCE OFFICER.
DRAINAGE PITS - COVERS SHAH NOT BE PEALED UNTIL THE PITS
HAVE BEEN INSPECTED AND APPROVED BY THE COWCA OFFICER.
GENERAL NOTES CONCRETE NOTES CIVIL NOTES
THESE CPA.N:S ;HA.I BE READN P(F=P V1 ROADS SPOT AI ATION STANOAPO SE. TON 1Q3'(AST A:-L DIMENSIONS ARE IN MILLIMETRES UNLESS 5WWN PROVIDE TOOLED )DINTS N KERBS KERB AND CHANNEL AF
CCN 1)S( 13N • THE 51'. FKATION AND VIALS I.ON(RE If ECGNGS PA'rIS AND OTHER SUPFA(NGS' CIIEPWISE ALL LEVELS SHOWN APE 10 AUSTRALIAN HEIGHT 2 0. MAXIMUM (EN TRE$
ALL O'HT' R= - AS' 3N.",!'ANY$ FOP CONS'PUC TION of TA,. S ANO ASSO(IA TI O PT F LR(N((S DATUM I TBMI AS NOTED ON THE PLANS ALL SET-OJT
DRAWINGS SP(:I A' CNS LLEN7 (D.DPONATES ARE BASED CN AN APBITPAPY (O-ORDINATE SA.-: - I 5 '-PASS PAVEMENTS WHERE REQUIRED FOR
ASTRUCT'ANS AT( ANY WRY TTEll ALL CC%,PETE AND LOI.PE It F'PAi IKE SMALL BE GENERALLY SYSTEM AS NOTED NS TA., A' '1 W HERBS AND WHERE NEW WORK IS TO
INSTRUCTIONS 555(0 ObwNG. THE COURSE OF N ACI;CRCAS' F WITH AS 1600 LCN(PE TL SIRU( TORE S CODE MA
THE CONTRACT ANY DISI.REPAN(ES SHALL BE N SS :'H-RAISE SPECIFIED OR APPROVED BY THE ENGINEER .
REFERRED TO THE ENOINEEP'OP DISCUSSION AL_ NSITU CONCRETE SMALL HAVE A (HARM IEO S' I
A : % .> TIE . PIPES OR CULVERTS SHALL COMMENCE AT THE THE CONTRACTOR SHALL AT AEL TIMES DURING THE CURRENCY
STRENGTH
C"'fP WISE AT 21 DAYS IF (I OF 15 MPA UNLESS NC'f;
DRAWING INDEX BEFORE PROCEEDI NG WITH WORK
DIMENSIONS SHAT . NC- BE OBTAINED By
](55''rU' INC
PRIOR TO ANY WORKS CMMENCMG THE CONTRACTOR SHALL
OF THE WORK PROTECT THE PUBES! 'ROTH THE WORKS. PLANT
TRENCHED ETC OCCASIONED BY THE WORKS BY THE USE OF
APPROVED BARRICADES AND BARREPIS SUCH PROTECTIVE
LCNrP TE ELEMENTS SHOWN ON THESE DRAWINGS MUST NOT
SEALING THE DPAAINUS COMPLETE A (HECK Of ANY EXSING CONNECTING SCPMWATER MEASURES WILL BE SUB r I to THE APPROVAL OF THE
GENERAL NOTES, DRAWING INDEX AND STANDARD DETAILS TABLE BE REDUCED IN ANY WAY W' THOU''HE ENUINEEP S
CO1OF 01 APPROVAL NO HOLES EHASFS OP EMBEOMENTS OTHER DETAILS, INCLUDING INVERTS, DIANE TEPS DEPTHS. MATERIAL ENGINEER AND A REPRESENTATIVE FROM CITY Of BALEPAT THE
-ILL NOT BE PERMITTED ET( TO CONFIRM ANY EXISTING 0/TAILS SHOWN ON THE iONTPAI'OR SHALL BE RESPONSIBLE FOP ANY DAMAGE OP
THAN THOSE SHOWN WILL BE PERMITTED IN ANY CONCRETE
WRITTEN APPROVAL O THE
C02 OF 02 PROPOSED ROAD & DRAINAGE LAYOUT PLAN ELEMENTS WITHOUT T.,( ENGINEER S APPROVAL DRAWINGS ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER
IA1UPI AIR IN FROM THE NFCALE. T 00 NSUIFIG(N(r OF SUCH
%tALr:ONS
REINFORCEMENT NOT STOPMWATFP DRAINS APE TO BE PVC SEWER QUALITY PIPES
C03 OF 03 CIVIL DETAILS SHEET DUPING CONSTRUCTION THE SITE SHALL BE
MAINZ AINFD IN A STABLE (ONCI (ON AND NC
P . DENOTES STRUCTURAL GRACE PLAIN POUND
GAPS 10 AS 1702
OP REINFORCED CONCRETE AS NO'EO INC CONTRA( TOP IS ADVISED THAT THE MINES ITRENINES)
RFGUI A40NS 1987 WILL APPLY TO'HIS PPOR(T TH
RAPE OF THE SITE SHALL BE UNSAFE AS A P! PIPES APE TO BE RUBBER P1NC JO NTED CLASS 3 UNDER CIINTPA. TOP IS REQUIRED ID SAITS/Y ANOIOP PUT INTO
N - DENOTES 1101 POLLED 7E0UPMEO BARS TO
RESULT OF THE CONSTRUCTION PPOLEOURE AS 13)21410YM VEII(I E PAVEMENTS ALL PC PIPES ELSEWHERE APE TO BE EFTEL I ALL RLOUIEHINTS OF THOSE REGULATIONS AND THOSE
SL72 DENOTES PFINFOPII FMf NT I AFRO to AS 1304 ((ASS 7w11HOUT RUBBER PING JOINTS OF THE OFFICE OF MIN[PA15 AND ENfPGY
MAILPIALS AND WORKMANSHIP SHALL BE •N 112 DENOTES SIZE OF FADPI<I
DRAINAGE PIPES MUST BE BEDDED IN ACCORDANCE WITH THESE THE WOPXS SHOWN HEPI IN ARE SOVIET TO THE SUPERVISION
STANDARD DETAILS TABLE A(()PDANCE WITH T14 5PLUF lr ATION AND
SUNSHINE -OASI PF^OIONAI COUN(N
L APP I N G R EI NFORC E M E NT
I'1
sQ
Ir WINOS Of THE PPINOPAI $ APPOINr(O SUPFmNIEA(IENI
ONAINACE SERVICES ANDCCNOUIT TREN(NIIS UNDER CARE IS TO BI I AMI N 10 PILOT UI EXISTING FENCES, BUII DINGS,
REVISION Of AI I IFS FVANT SAA 00(1, THE
DESCRIPTION AUTHORITY STANDARD DETAIL REFERENCE HLOUIREMLN IS OF THE UVEENSLAND BUILDING PAVEMENTS I COTPA THIS AND PAVMC,-APE TO BE BACKFILLEO
TO THE UNDERSIDE OF THE PAVEMENT WITH AN APPROVED
FIT TINIIS, SEPVII TS FUIlS'101 SH INAGL TREES ANO OTMEP
ITEMS IQ Of RL I MINI D FROM ANY DAMAIif
PEGUI A7IONS , THE BUILDING CODE Of
BAR SIZE OTHER BARS CONSOLIDATED MATERIAL IN ACCORDANCE WITH III[ RELEVANT
AUSIPALIA AND THE RELEVANT AUTHOPIT)FS p,t, TOP OR MORE
MUNI(IPAII TIES I ONOIIIONS UNWANTED PITS PIPES SERVI(I S I I T IN PAVEMINT ARIAS APE
ONtPF If BELOWI
CONCRETE LAYBACK SUNSHINE COAST REGIONAL COUNCIL IPWEAQ D-0051 UNLESS NOTED OTHERWISE ON A PARTICULAR
NEE 300 1/4L LOCATION OF EXISTING ONDEAGPOUND SERVICES SHOWN IS
TOO III MOVED AND TILE HOLE (Al OIL (ED WITH AN APPROVED
(ONSOI IDATFO MATERIAL IN AlI ()ROAN( L'WI IH IMF PEI IVANT
DRAWING THESE NOTES SHAT; APPLY N16 400 MmrATIVE ONLY THE [CNTPA( TOR IS RESPONSIBLE FOR MDNM.IPALI TIE S CONDITIONS
ANY STEP IRONS SUNSHINE COAST REGIONAL COUNCIL IPWEAQ D-0016 N70 600 (ONIACTNG ALL AUTHORITIES TO DE 'EPMINE III[ LOCATIONS
THE CONTRA( TOP SHIM L ASPECT THE SITE AND DETERMINE THE
IHE LOCATION Of UNDERGROUND OF UNDLPUPOLIND SERVICES AND OTHER ASSOCIATED WORKS.
(OV P I XISNNI, ASPHAL I PAV'IPi PITS PIPES SERVICES TREES
SERVICES SHOWN ARE INDICATIVE ONLY.
ALL SEP INLETS SUNSHINE COAST REGIONAL COUNCIL IPWEAQ D-0061 IH[ CONTRACTOR IS RESPONSIBLE FOR CLEAR, O v(I ' C PI INOR(EMEAT SMALL Of AS NOTED ANY (LASH OF THE WORKS WITH A SERVICE HS TO BE REPORTED KFPBS SPANS BUILDINGS FIT TWIGS, FURNITURE SIGNAGE ETC
CONTACTING ALL AUTHORITIES TO ON THE T'AA N-S TO ME ENGINEER IMMEDIATELY THE CONTRACTOR SHALL I MA' APf TO BE REMOVED AND HE SHALL ALLOW N HIS TENDER
GETERNAE INC LOCATION OF ENSURE THAT SERVICES APE FULLY PROTECTED DURING PHIL I - C^ ALL :.OSTS ASSOCIATED WITH INE NECESSARY
UNCERGROUND SERVICES PRIOR TO THE (0N(RE TE (OVER SHALL BE MAINT AIMED BY THE USE CONSTRUCTION ANY SERVICES DAMAGED DUPING (ONSTPO(TIN PE MCV AI
ALL STORMWATER DRAINAGE IPWEAQ D-0080 O APPROVED IHAIPS AND/OP (ONI PE TE BLOCKS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE
SUNSHINE COAST REGIONAL COUNCIL (OMEEN(EMENT OF CONSTRUCTION WORK.
!ONOLA IS PIPES ETC ARE NDT TO BI RE A(EO IN IN AP(AS WHERE THERE IS 10 BE FILLING UNDER PAVEMENT
HEADWALL ANY ;LASH OF WORKS WHIM A SERVICE
Is TO BE REPORTED TD THE ENGINEER (UNLRE IE COVER SEPVH ES OTHER THAN THOSE SHOWN ON THE DRAWINGS MAY AR[AS TIE SUBI,PAOE SMALL Of (LEAPEO O ANY 8001
EXIST THE CONTRA: HOPIS TO ALLOW FOP TIC ALTEPAT,ON TO MAT TEP AND I OOSE MATERIAL TO THE DESIGN LEVELS THE
NEOIATELY. THE CONTRACTOR SHALL
THE SLUMP Of ALL CONCRETE At INC TMML OF PLACING AT SERVICES WITHIN THE SITE. HELLOING THE AOLUSIMNT O PIT SUBGRADE AREA SHALL BE PROOF POLLED UNDER THE
ENSURE (MAT ALL SERVICES ARE FULLY
UNDER DRAIN DETAILS SUNSHINE COAST REGIONAL COUNCIL IPWEAQ WSUD-003 PROTECTED WING CONSTRUCTION ANY THE 100 SHALL BE SSW. .2. TS-' IOFRANCE LNG COYER [VELS AND THE PINOVA- AND SEALING OF UNWANTED ENGINEERS SUPVISION USN) A 10 TONNE AXLE LOAD TO
SERVICES A ASSOCIATED PITS S C TTINGS LOCATE ANY $OT SPOTS ANY SOT SPOTS SMALL Of
SERVICES DAMAGED CURING
ALL CONCRETE RACED IN POSITION SMALL BE AOEOUATEI EXCAVATED AND REPLACED WITH AN APPROVED MATERIAL IN
CONSTRE,'(TION SHALL BE REPAIRED AT
TN[ (ONTRAL70RS EXPENSE.
VIBRATED EXPOSED SUBGPADE AREAS SMALL BE PROOF POLLED UNDER T50Kn.OMPA( TIED I AVERS 10 A MOONED UP- DENSITY OF 95%
THE SIAEPVISION OF THE EN s3EER
' USING A TO TONNE AXLE CODA( TON
THE TERM 'flw]INFFR S-A °EA•, A ALL CON(PE TE SHALL BE (WED 10 THE APPROVAL OF I. OAO SOT AREAS DETESTED SHALL BE EXCAVATED AND INC CONTRACTOR $MAE L ALLOW TO PROVIDE TEMPORARY
PEPPESENTAT VE APP::. N-=' --_ THE ENGINEER BA(Kk.LEC AS DIPE(IEO BY "°E EkGMEP SMUT IEP$ FOP ALL TPEN(IES AS NEEf SSAPY
5,55. NH LEAS7 -E7:1/.::.1 .
ALL VPEWOPK (AST INTO COMPETE 15 TO N SLEEVED THE PAVERS' SJ8-3ASE E RRS' IS TO BE COMPACTED TO SURPLUS sPOE NOT REO WED BY TVE DEVELOPER SHALL
OR LASGED WITH APPROPRIATE (OMPRESSNEE 91% HOOFED MAXIMJM DRY OE NSIiY(GSPAC'ION THE BEFOE THE PROPERTY OF THE CONTRA( TOP AND SHALL BE
MATERIAL FOP THE FJ,.: ENiTH CF EMBEDMENT PAVI`TENT BASE COURSE TO 98% MODIFIED MAX MUM CRY REMOVED FROM TIE SITE TO THE MJWrPAL TIP OP A SITE
Cf N,'• TES TING LOCATIONS IN ACCOPOANI.E WITH VICROADS APPPOVEO UNDER THE COUNCIL PLANNING I ENVIRONMENT ACT
ASPHALT NOTES = 1 ArONS PC316(0 ALL PAVEMENT TESTING TONATA AND THE EPA Al T
STAA: M1^lS
-PV F[A(SS''FFI(ATIONSTAPPOAR0 SUCTION 407'H01 'ME TO" TWA, TOP SHALL DEVELOP ANC ENSURE THE STRUT
MK AS 'HA' F,P ONS'PU( TION DETAILS AND ASSO(IATEO IMP'. EMEN'ATION OF Al. APPROVED SITE ENVIRONMENT
A.LWORS AO IA, ENT TO IE T 5"E APE TO BE APPROVED
PE TEP[N(S MANAGEMENT SYSTEM GENERALLY N A C'.OPOANCE WITH THE
INSPE'. T EO BY SUNSHINE (OAS' °EOIONAL COUNCIL
EPA RUBLI(ATION CONSTRUCTION TEi H MOUES FOR SEDMNT
THE ORIENTATION OF ALL S'OPMwAIER OPAINASE ACCESS POT LUTION CONTROL PUBLIEATION NI 27S'
! OVEPS A GRATES APE SHOWN IMV:ATIVE'LY AND ARE TO BE
MANUF AT LURED I. INS IALLED IN A(.(OROAEEIt TN
FOR APPROVAL
G MANSELL M701/ll
P11A S MANTERFELD 1500 CIVIL DRAWING
)W A APPROVAL IOUCUO Rat YH Al TOM GROUP Pry LIKE
EWWrm
H. TROON PTY. LTD. PROPOSED BUNNINGS
Ins MULTI urr/I rVII PrIH r^HKr -R FIMtEWrA
WAREHOUSE GENERAL NOTES, DRAWING INDEX &
0*0 el-A7. RWIWW VIC 3150
FP
O LOn1IATISI AOp PIT III
'jell TGM Rh MOH 5330 NEAR
Web lQm9'PW [PIn
AON I1125MAWI
1 1031 5379 210E - 10 5331 H7
TOIL Sill TIID
91 H0H1019119m YY
EUMUNDI -NOOSA ROAD
NOOSAVILLE, QUEENSLAND
STANDARD DRAWING TABLE
4400-02-CE C01 03 02
Page 4
PIT SCH EDULE
INTERNAL DIMENSIONS INLET OUTLET
PIT
PIT No TYPE LENGTH WIDTH FROM PIT DA (01 INVERT RL DIA SRI INVERT AL ESL PIT DEPTH REMARKS
DPIVFWA, IFSiDVF P TO
JE:. ' Y 0NI PE TI
BE(ONSIPU,TEO IN
A(IOPOANI L WITH IPWEAO 11.. 5 ]; 1CCAPP1P D' '6 95 .-AVY Pity CRATED (c
STANDAPC OPA WIN,L 11 .005'
Pf iF SC' ... '.0Do :,_c PPi „_ 700A PFP-P. a!0 ---Ale, )UTSGRATEDICV
5250 NLET IS OVEROESIGNfD TO
r'0' P ,. "Dc =18 TDO * 78.0 P.P?P. ., .,, AVYCUTYGPATED!GV
A-.T AS A FAILSAFE OVERFLOW IN I111
OF RAINFAI I IN FBI ASS Of 1 I, P)1 ; Pb ISSA Ph' PP 31 1155 -1Y DIRT" ISPA'ED(I:V--
100 API 009 ,.. ^.. D'; ;ODA PIP POI '37 31'A P(P PP 'c f: I; !I' 'i0 •- A:Y ]IT" GPA-EO (G v-
'10 ,.. 30."0 P^P PP. i. 17 P5 0'9 -;AVY Pitt GPA-ED:Ce'--
II' ,.. 3::A PLO-P, 'I I; o-S 050 MEJIJMCU'Y:CN(PETE
cIi EW '120 1000 I ? .NIIDN 3»,i' N ';I SU' ?000 PIPE
- -
0 X MOTORCYCLE PARKING BAYS :USA P; G P.' ".'P !:..0 PIP 'I:1 I 'SE']IJM CITY (ONtPFIF :...
'15 '000P.'P P P , ' 1;C0 Pi PPP I.'- ^:AVY D'JTY GRATED CL'l-
cI5 SR s:: ,:: R16 b 5 5 0 P:F P S I 11" 3,80 PPRP . , 5- YEO'UM CO YCONEAEIE
MI6 SIP ,,. ,^. PII 5;7¢a_P PP1 ;21 'COA P,PPP, . .,, l) UM DU IYCON(RE It ...
'9IA P, I 155 . YE J^UM CUTY(CN(RE TE
19A 5250 P- ES' OF -ENIIONbps 'N - O SU4 iISO PIPE
52I 5250 P;"^.1 :.:O PI P 58. 1',3. ... 11 AVYOUTYIPATED(OV
52,0
P25 =FP I C1 ^, 5751 PIP PP, .,. ,, =AVY DUTY GRATED COP'
1, '070 P,_P'PI
'21 pEP ,250P_PAP1 '. _. EO PIP 1,. '=AVYDUTYGRATED (DY-
224 ?I,)0R;P 1515
SIP ,,. - 57:0P PR 71 'S H'S UIJIY CONCRETE,:
p1] 5750 P;PPP1 ., 19
1127 UP 'C. -T -. 555. PF FPS 7191 5)=CFIP PP. 119. t_ nAPPS,'YGRAIFOCOVC-
^ :^,,GY1. V 4 1. >CP 1125 :25. P F=111 5 p1 51.0111 PP, 1 ,.. .. Mc;" M UUTY CONCRETE
P55 'loaf P'-PJ ''.55
of EONSIRUCTED LV ^"
P211 Gp 5Ci s 1179 2. P'P'PI 9B 5`-AP:POP IP•P o.. ... 'AV°L'YGRATED (OVI-
OROANIE WIIH1Pp 1 Q
STANDARD SPAWIN. - "^ TANK 5259 PE P 'P 1 1: Vl
P76 .p SCi '5. -fAY"CU7YCUlATEDGPE-
LU ,,
F2' SE'' 5r, 0 M- OIUM DU Iv ON(Pf ft
f- ,
1129 5f' ,1.. .. - - - !:: '515 1..;: M.CIUM GUIs 1:ON(PEt, ^I.
0
1129 -?1
' ;250 P' P 9 :_TENtI N HA, E. TO SUIT 5250 PIPE
P?7 .P :: S?S'A1 P 05' -EAVY DUTY (ONEPF If
Y3' E%PU; iM C- 1 F11 ,50011' . FKIS'ING PIPo B4' ., Ep511116 PIT
0'12 EW - - - :1 Pi P 815 - - EW fO SUIT 4500 PPE
PII'A iPT PiP 3!I 152'. 2',5 -iUME:APO 12 GPI( OP APP- v 11v A`II
15
P UT 17P^ 130:' `Pr-, --f ^10 ".P i's: IS Ol r.. turf A'11: 1 UP TIP
S BI LANUIN 5A PUT 0:5 2'.1i "'J, 1'0 30' 1155 7`0 1 ::,. 1-:i '-^'J .4•I'
F A SEc 900 ':: - '::O MCP '516 16'C
EW - DENOTES ENDWALL
SEP - DENOTES SIDE ENTRY PIT
P - DENOTES JUNCTION PIT
04 LANDIS,, P17M OP - DENOTES GRATED PIT
'PT - DENOTES GROSS POLLUTANT TRAP
GSEP - DENOTES GRATED SIDE ENTY PIT
LEGEND
EXISTING SURFACE CONTOURS
0(5F, TITI F ROUNTIAPY
ISLL IrnwalLU LPA NA,L1
a© PPOSEO TUNE T1011
PROPOSED GRATED JUNCTION PIT
'5
15 0• PROPOSED HUMEGARD GROSS
POLLUTANT ;PAP
\ ^p05P: DESIGN PAVEMENT LEVEL
L .
HEAVY DUTY ASPHALT PAVEMENT
UU/t
HEAVY DUTY CONCRETE PAVEMENT
PROPOSED ROAD PCLOLATION DRIVEWAY (POSSOVTR TO
RLFEP EXTERNAL WORKS OF CONSTRUCTED IN
OOIUMENIS ^((OROAN(L WIT IE PWIAO
'IA'IDAPOOPAWINGPCCS' t. 0 LIGHT DUTY ASPHALT PAVEMENT
CAR PARKING
VnOPOSEDPOUNOABOU I
PETER EX7[PNAL
212 REGULAR PARKING
WORKS DDEIIMENTS
4 UNDER (OVER PARKING
4 DISABLED PARKING
`
!y 220 TOTAL
8 MOTORCYCLE BAYS
FOR APPROVAL
CIVIL DRAWING
TOM GROUP Pty Ltd AB PROPOSED BUNNINGS
B01aa
1315 Hurl AmN
OaIna1. V% 1350
Buy o{u YC ^ryP14 W IWVIAIAL
WAREHOUSE PROPOSED INTERNAL DRAINAGE &
ft (03) 53308880
Web 191
EUMUNDI-NOOSA ROAD PAVEMENT LAYOUT PLAN & PIT SCHEDULE
ABA 11125 561451
NOOSAVILLE, QUEENSLAND
4400-02-CE ' C02 03 04
Page 5
tOF1* POPANA!$ AT PIT 795. AMD
Pt OF To" OF NI'f R MEDIA - 145 • AND
N N TOP OF TPANSITION LAYER . 100. AND
PL OF NOT TOM OF DRAINAGE LAYER -190. AND
co 70P OF BASH 1015. AND
0 1OR OF WA TER . W Si- AND
TOP OF EX'EN000 DE TENTON - 110. AND BASIN CVEaLOW PROVIDED VIA
INVERT OF BASIN AI OUTLET - 460. AND OVEP51ED MEET
INVERT Of FILTER AT NI - 190. AID
POSSIBLE ACID SULFA IF S0A HORIZON - $ 0 AND
,UNDER GRAN JUN' 110N PIT IBOL'. F,'wN
100.04 THICK I.RUSMtC ROCK BASE TO BE
AID 100 - SUMP PROVICE0 IN FILL A SUB-CRAUC AREAS,
00fRIE001
I M 4 9 sr0R19 1 MULCH TO LANDSCAPE
ARCHITECTS SPECIFICATIONS -SOIL REINFORCEMENT TO OAT TERS
NOTE MN SO.. (OVER. " --
SAW LUIS 0 6. SPACING INAOBILAI IN EITHER DIRECTION.
SAW CUTS TO 701. IN DEPTH,
WHERE NDICATED
BATTEROOK
TORE FONSTRUCTEDOF SL61 10 BE PROVIDED CENTRALLY IN BOTTOM
600.. LONG CENTRALLY UNDER SAW CU I.
ENSAR B3AXIAL GIOGPIO TOR
APPPOVI U I OVIVAL I NIT IN LAYERS IN
A(CORGANI w' IIIMANUFA(IUPERS
10004.0 SLOTTED
PFIORMl SDAI IJNS TYPICAL CONCRETE PAVEMENT DETAIL
PV( GRADE 1 m 200 EPO510N PROTECTION MA t TO BE
(ONNEI,I ISO AID 100.,1 PER S TO 100
NON-WOVEN GfO TEXTILE LINER PLACED ON SURF ACE 10 LANDSCAPE
EXISTING SEP, MAKING 000D WATERTIGHT 100
I&pM 419 OP APPROVED EOUIVALENTI ARCHITE(C SPECIFCATIONS
(nNNF1 II TIN
200
BIORETENTION SECTION A-A 1L1 ` 100404 BEDDING LAYER
)Smm MIN CONSOLIDATED THINNESS Of I III N
ASIIPAL I IO mm NOMINAL 5121 AGGPEGA I. 1/I
00 SLOT IED PVC AT Im 200 GRADE ^ON A PREPARED AND PRIMED SURFACE
DRAINAGE LAYER 5, ONE SIZE AGGREGATE
1200mn -°iKNFSSI
I NOTE UNDER DRAINAGE (LEAN OUTS NOT
SHOWN FOP CLARITY
TRANSITION LAYER rI f AN SAND 2mm NOMNAL
10004,1 MIN IONSU11UA 111, 1IM(1M SS OF
(LASS 1 10mm FINE I RUSNFO 110(K 91
MAXIMUM MODIFIED DRY DENSITY COMPACTION
212; A- IIPI Ali .:'O(RO ' IU(KNFSSI
FILTER MEDIA MINIMUM 100+40LIL CONDUCTIVITY 190m./hr - TSB.. (ONSOI IOATEO THICKNESS OF (I ASS
MAVIYI_M -IYOPAUI 4 CONDUCTIVITY 110.m/Nr TO BE VERIFIED BY 3. 40 mm FINE IPU5HED ROCK 97% MAXIMUM
12IE ••Nd AI TFSTING PRIOR TO SUPPLY IC SITE 10 AS MODI2IFO DRY DINSIT Y FOMPAF TON
I /;Iii. A-'i'II
PPEPAPI D ANU APPROVED
.PLANi MAI II. MINIMUM 3% MAXIMUM 10%
SUNIPA01 MAI EPIAT
MINMUM pHI S MAXIMUM pHl5
MAXIMUM SAL I CON I(NI 12d5/m
TOT AL NI INOGIN MAXIMUM 1000 049/149 TYPICAL LIGHT DUTY ASPHALT PAVEMENT
OfI IVEPY OD(KE IS APE TO INDICATE SOIL PARAME IERS AND BE
SUBMIT TED TO 5lyl.
IA- MINI ONSOI IDAT1D THII KNF5S OF TYPE H
ASHPAL 110 mm NOMINAL SI/C AGGREGATE SIZE
ON A PAEPAPED ANO PRIM) O 51141 All
100mm MIN 139001 bOA I EJ T Im KNESS OF
I I ASS 1 1OIn. 1 NL LRUSHLD 1401K 91
MAXIMUM MODIFIED DRY OFNSITY COMPACTION
100.04 CONSOLIDATED THICKNESS OF (LASS
NOTE A,; PLANTING AND TOPSOIL IN ACCORDAN 1 1 40 ..FINE (PUSHED POCK 97
BASIN DETAIL WITH LANDSCAPE ARCHITECTS SPf(IFI(AIC/Ay MODIFIED DRY DENSITY I.OMPAI. TION
TIPFPAREO AND APPROVED
SUB-,PAUk MATERIAL
UNOERURAIN 100mm SLOTTED
PV(@ 1000mm Cd
TYPICAL HEAVY DUTY ASPHALT PAVEMENT
SCALE N.t S
NOTE PA III ME NI PROFILE TO BE RENEWED FOLLOWING C OMPEE TION Of I IL II NG 0
PREPARATION OF SVB(AAOE FORMATION 0 COMPACTION TIES TING
1000nn UNOEROPAIN TO SEP
FROM BORE TENTION CELL
1P TO LOIN 0450mm AND 150mm
UNDEROPAIN FROM BIORETENTION CELL
NOTE A r
AIL BOuf TENTION UOEPOPAINS to
BE F"ED WITH LLEANOUTS N
A((ORDAN(I WITH PWEAO WSUD-003
BIORETENTION CELL PLAN - UNDER DRAINS
B3
20001200-450* OUTLET)
- A99 GEGFABRIr LAID
UhDEPNEATH PGEK SPA
BARRIER KERB BARRIER KERB
"00 1560 OUTLET)
ENDWALL BEACHING PLAN
ENDWALL BEACHING ELEVATION
FOR APPROVAL
G MANSELL "lot/),
SHAD Mr AIOMIIO AEI.
S MAMTERFELD ISO CIVIL DRAWING
0,14(041 W AMM41Y4 TOM GROUP Pry LAa H. TROON PTY. LTD. PROPOSED BUNNINGS
Wm RY4 ills 51,. II 9,1,01 WAREHOUSE
AWlmd XIIS Iles CIVIL DETAILS SHEET
EUMUNDI-NOOSA ROAD
O COrTNpT I IF A P011 rO ITO
TGM NOOSAVILLE, QUEENSLAND
4400-02-CE C3 3 1-03
Page 6
1
t
BUNNINGS NOOSAVILLE
EUMUNDI-NOOSA RD
BIORETENTION AND GROSS POLLUTANT
TRAP MAINTENANCE & MONITORING PLAN
1
I REF NO.: 4400-02-CE
AUTHOR: TGM GROUP PTY. LTD.
DATE: APRIL 2011
1
Page 7
ri BIORETENTION BASIN & GROSS POLLUTANT TRAP
PURPOSES FUNCTION
t The bioretention basins installed at Bunnings Noosaville provides treatment of stormwater runoff as
well as improve the landscape amenity. The gross pollutant trap provides for primary treatment of
stormwater runoff prior to it discharging into the bioretention basin in order to capture sediment and
other gross pollutants.
The purpose of this bioretention basin maintenance plan is to detail the operational phase
I maintenance requirements of the bioretention basins installed at the proposed Bunnings Warehouse
at the corner of Gateway Drive and Noosa-Eumundi Dve. Routine maintenance of the bioretention
basins shall be undertaken by Bunnings to ensure to efficient operation of the stormwater quality
treatment train.
This maintenance plan should be read in conjunction with the Surface Water Management Plan for
the site.
BIORETENTENTION BASIN
PLANT ESTABLISHMENT
Establishment of vegetation within the bioretention basin is of critical importance as vegetation helps
maintain porosity of the filter media in the basin and removal of excess nutrients (considered a
pollutant at the high levels typical of urban stormwater runoff). The plant establishment period within
the first two years is the most intensive maintenance period with watering, weeding, and possible
replanting to be carried out. The following schedule for watering of plants should be followed:
• Week 1-2 3 visits/week
• Week 3-6 2 visits/week
• Week 7-12 1 visit/week
• After Week 12 As required during dry periods
REGULAR MAINTENANCE
The Water Sensitive Urban Design Technical Design guidelines for South East Queensland describe
the following typical maintenance requirements:
• Routine inspection of the bioretention basin profile to identify any areas of obvious increased
sediment deposition, scouring from storm flows, rill erosion of the batters from lateral inflows,
Page 8
• Routine inspection of inflow systems, overflow pits and under-drains to identify and clean any
I •
areas of scour, litter build up or blockages.
Removal of sediment where it is smothering the bioretention basin vegetation.
• Repairing any damage to the profile resulting from scour, rill erosion or vehicle damage by
replacement of appropriate fill (to match onsite soils) and revegetating.
I •
•
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of
clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
• Removal and management of invasive weeds (herbicides must not be used).
• Removal of plants that have died and replacement with plants of equivalent size and species.
• Pruning to remove dead or diseased vegetation material to stimulate growth.
• Vegetation pest monitoring and control.
A maintenance checklist is to be completed for each scheduled maintenance and kept in a
maintenance log. See Appendix A for a copy of the maintenance checklist.
GROSS POLLUTANT TRAPS
The gross pollutant traps require monthly visual inspection of the collection chamber for the first year
to gain an understanding of seasonal variations in pollutant loads. The chamber should be emptied
via eductor truck whenever it is over three quarters full in accordance with the manufacturers
recommendations. After the first year the inspection frequency may be reduced to quarterly and
emptying scheduled in accordance with observations made in the first year of operation, but at least
every 6 months.
WATER QUALITY MONITORING
In addition to the qualitative monitoring described in Section 5.2 of the Surface Water Management
Plan, the following monitoring is to take place for a period of 3 years from commencement of use of
the completed site;
• Every three months samples of the outflow resulting from rain events up to the 1 in 3 month
ARI that produce sufficient outflow from the bioretention filter are to be taken from the
bioretention underdrain junction pit.
• Samples are to be tested for the following parameters and limits;
o Turbidity: <10 NTU
o Chlorophyll a: < 5 pg/L
o Oxidised N: <60 pg/L
o Ammonia N: <20 pg/L
o Organic N: <420 pg/L
t o Filterable reactive phosphorous:
o Dissolved oxygen:
o pH:
<20 pg/L
85-110% saturation
6.5-8.0
o Total Nitrogen: <500 pg/L
Total Phosphorous: < 30 pg/L
o Suspended Solids: < 6 mg/L
Page 9
o Conductivity: 500 pS/cm
Water samples shall be analysed by a NATA accredited laboratory. Results must be provided to
Sunshine Regional Council on a quarterly basis in digital format.
I Methods for rectification of problems identified through the monitoring process are identified in
Section 5.2 of the Surface Water Management Plan. Other methods of rectification may also be
implemented in liaison with the Sunshine Coast Regional Council.
RESETTING THE BASIN
If for some reason the bioretention basin media needs to be replaced this can be achieved with the
use of an excavator with a 30m arm, or other suitable means as identified by the operator of the
facility.
I
I
I
Page 10
APPENDIX A - MAINTENANCE CHECKLIST I [OCR of page images] APPENDIX A — MAINTENANCE CHECKLIST
Page 11
REGULAR INSPECTION & MAINTENANCE
Location: Bioretention Basin
Site Visit Date: Site Visit By:
Weather:
Routine Inspection q Complete section 1 (below)
Purpose of Site Visit
Routine Maintenance q Complete sections 1 and 2 (below)
NOTE: Where maintenance is required ('yes' in section 2), details should be recorded in the `Additional Comments' section at the end of this document.
1. Filter media
Section 1 Section 2
in addition to regular inspections, it is recommended that inspection for Maintenance Maintenance
damage and blockage is made after significant rainfall events that might required? Performed?
occur once or twice a year. Comments/Rectification Required
Yes No Yes No
Filter media (CIRCLE - pooling water / accumulation of silt & clay / scour /
q q q q
holes / sediment build up)
Litter (CIRCLE- large debris / accumulated vegetation / anthropogenic) q q q q
Water Sample Collected and submitted for testing q q q q
2. Vegetation
Vegetation health (CIRCLE - Signs of disease / pests / poor growth) q q q q
Vegetation densities (CIRCLE - low densities - infill planting required) q q q q
Build up of organic matter, leaf litter (CIRCLE - requires removal) q q q q
Page 12
Weeds (CIRCLE- isolated plants / infestation)
q q q q
(SPECIES-, .... ....... .................. . ..............)
.. .... . ........ ........
3. Pits, pipes and inflow areas
Section 2 Section 3
Maintenance Maintenance
required? Performed?
Yes No Yes No Comments/Rectification Required
Perforated pipes (CIRCLE - full blockage / partial blockage / damage) q q q q
Inflow areas (CIRCLE - scour / excessive sediment deposition / litter
q q q q
blockage)
Over- flow grates (CIRCLE - damage / scour / blockage) q q q q
Pits (CIRCLE- poor general integrity / sediment buildup/ littler /
q q q q
blockage)
Other stormwater pipes and junction pits (CIRCLE - poor general integrity
/ sediment build up/ litter / blockage q q q q
4. Additional Comments
Page 13
s
Noosa Buni
^ ENVIRONMENTAL MANAGEMENT PLAN
AND PROCEDURE
^ FOR
^ NOOSA BUNNINGS
1
1
1
I
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
s
Page 14
C
NOOSA BUNNINGS
Environmental management plan and procedure
1 Environmental Commitment
1.1 Introduction
The objective of this Environmental management plan and procedure (EMP) is to assist us to responsibly
manage the environmental risks associated with our on-site activities.
This includes complying with all relevant environmental legislation, standards, and codes of practice.
The EMP covers the following areas:
• A list of the project's environmental impacts and risk areas
• An operational plan for managing these risks
• A list of personnel accountable for implementing the operational plan
• Emergency procedures and contact details for relevant authorities
Our commitment is to ensuring that the environmental risks associated with this project are minimised, and
where possible eliminated. It is every contractor's responsibility to read and understand the Environmental
management plan and procedure and the Site Construction Waste Management Plan and comply with their
requirements.
1.2 Using this Plan
The EMP document also refers to the following documents, which can be accessed by clicking on the links
below and throughout this plan. Hard copies of these documents, as well as relevant regulations, codes of
practice, and environmental guidelines, are kept in the Environmental Management folder in the Site
Office.
Environmental Guidelines for Major Construction Sites
Site Construction Waste Management Plan
Waste Management Checklist
Contractor Environmental Compliance Checklist
Environmental Incident Report
Corrective & Preventative Action Report
Weekly Environmental Report
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
Page 15
nj
2 Environmental Planning
2.1 Environmental Issues
The following environmental issues are potentially relevant to this project:
Air Quality Water Quality Waste Noise Land
• Dust • Groundwater Construction Noise
• Exhaust Contamination Waste and and Soil Erosion
Fumes Discharges to Litter Vibration
Stormwater
Our aim is to minimise, and where possible, eliminate these risks by preventing environmental
r incidents from occurring that could lead to injury or damage to human health or property, or
breaches of the law. In addition, we want to reduce any potential negative environmental effects
of our operations at The Noosa Bunnings Project, even where their impacts are less obvious.
For example, we want to ensure that our on-site activities do not contaminate local stormwater
drains and groundwater. We want to reduce noise and dust emissions from the site which may
affect the amenity of residents and businesses in the area. We also wish to make sure that we re-
use or recycle as much construction waste as possible from the Noosa Project.
We will achieve this through careful planning, which involves the following:
• Adherence to correct work practices, ie: cutting of concrete with vacuum and / or water
suppression systems.
• Use of machinery with environmental controls
• Setting environmental objectives and targets
• Training and information at site induction for all staff and sub-contractors
Effective environmental management is often a matter of common sense. Minimising
environmental risks is often done by adhering to the existing site safety requirements of keeping
the site clean, tidy, organized and include the dust / noise issues of the project in the induction
procedure / toolbox meetings. Many issues can be managed by quite straightforward procedures -
for example, dust can be effectively controlled by light watering of exposed areas during windy
periods
Each environmental issue has a particular risk associated with it, which is found by calculating the
t probability of a particular impact occurring (Contaminated ground, Asbestos etc) and the
consequence of such an impact if it does occur. The process by which this has been done for this
site is detailed in Section 2.2.
Section 2.3 shows each environmental issue pertinent to this site, the potential environmental
impact, overall level of risk, and procedures for on-site management (control measures are listed
in detail in Section 3.1).
1 2.2 Risk Assessment Process
Risk assessments have been performed on likely environmental impacts to determine the
probability of a particular impact occurring, the consequence of such an impact if it does occur, the
overall level of risk, and the response required to address the impact.
Using the definition table below, the most likely environmental consequences from an incident are
calculated - "if the incident occurs, what is the likely consequence?"
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
Page 16
CONSEQUENCE DEFINITIONS
Value Effect Definition
Noticeable Minimal on oll-siic inipacl: fully controllable by routine procedures.
2 Significant Unlikely to cause oniofl site injury, damage or environmental impact. Event can be
quickly and fully controlled.
3 Seri
Serious Potential for onsite injury and damage: on/off site environmental impact.
Regulators may prosecute and community might express concern
Critical Potential for major onsite injury and damage: onoff site environmental
Impact. Regulators may prosecute and community likely to express concern
Disastrous Potential lilt major oniotl site: injury, damage and environmental impact.
Immediate action required. Prosecution and complaints almost certain.
How often is the incident expected to occur'?
FREQUENCY DEFINITIONS
r Value
3
Occurrence
Irv
Rare
Infrequent
Frequency of Detection
once]
1-2 times per year
1-2 times per mon
t 4
5
6
Occasional
Frequent
Continuous
Weekly
Daily
Hoary
What is the probability that the environmental impact will result, once the incident has occurred'?
PROBABILITY DEFINITIONS
Value Probability Frequency of Occurrence
Remote No such events liar CSer occurred
2 Very Low Isolated events have happened, but not for several years
3 Low Isolated events are possible
4 Moderate Event has happened occasionally
5 High Event has happened often
I
- -
Vcr 111L,11 (onseguence is tilniost tics table
The Risk Score is then calculated as follows: Risk = Consequence x Frequency x Probability (from the
values in the preceding tables). For example, an event that would result in a Serious Consequence
t (Score=3), with an Occasional Frequency (Score=4), High Probability (Score=5), results in a Risk Score of
3 x 4 x 5 = 60. The risk priority is assigned in the Risk Score Definitions table below (e.g.: 60 is listed as a
risk).
RISK SCORE DEFINITIONS
Risk Level Risk Score Immediate Action
-III ljmnclllately notify Jnc Alana cerand Project Alana,cr.
Eflcctise interim controls to be implemented before task commences. Long-
term control strategies shall also be implemented.
High 51-110 Immediately notify Site Manager who shall assess if, or with what controls,
task can proceed.
Significant 21-50 Communicate hazards details to affected personnel within five work days.
Site Manager to implement appropriate long-term controls.
Low 9-20 Local management to control by routine procedures and instruction.
Very Low 1-8 Local work group to control.
(AS'NLS 4360 Risk Management)
For the purposes of this environmental management system, all environmental impacts assessed as having a
risk level of 21 or above are considered to be `significant' and are shown in bold in the following table.
Control systems for managing significant on-site environmental risks are described in Section 3. 1.
H. Troop Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
Page 17
Environmental management plan and procedure
2.3 Risk Assessments of Operational Practices
The following risk assessment table lists potential environmental aspects and impacts associated with the project.
Environmental aspects classed as `significant' under this risk assessment are required to be addressed by the environmental management procedures detailed in
Section 3.1 of this EMP.
Operational Potential Impacts
Site Excavation & \V atcr foliation, ontununation of ]kcal I Not r,^,1u11.d: minimal lik1:lihuod of gruundvvatcr
Preparation groundwater during excavation contamination.
process. Contamination of Swale and settling pond system to prevent
stormwater. contaminated run off.
Waste Excavated soil contaminated 3 4 4 48 Licensed operators and hygienists to co
with asbestos or oil and ordinate excavated spoil. Site Construction
associated by-products Waste Management Plan.
Soil Erosion Landslip or subsidence 4 I 2 8 Control using routine procedures as detailed in
Geotechnical Investigation
Vehicle & Equipment Air Emissions- Local impacts on ambient air 1 6 3 18 2.3.1.1 Control using routine site
Operation Vehicle Exhausts quality environmental management
procedures
Air Emissions-Dust Windblown dust not contained 3 5 6 90 Manage using control measures listed in ENIP
within site; local environmental Section 3.1
impacts
Noise & Vibration Noise, vibration impact on local 2 5 3 30 Manage using control measures listed in EMP
residential and business Section 3.1
amenity
Oil or Fuel Leaks Uncontrolled discharge to 3 2 3 18 Bunt relevant drainage systems when
stormwater drain bunkering oils and fuels.
Concrete Pouring Waste Uncontrolled spillage, not 3 2 2 12 Control using routine site environmental
contained within site management procedures
Welding Risk of Fire or Explosion On-site incident leading to fire or 4 2 2 16 Adhere to SWMS's emergency response
explosion procedures in place.
Dangerous Goods Risk of Fire or Explosion On-site incident leading to Fire or 4 2 2 16 Lockable isolated storage with appropriate
Storage explosion emergency procedures ie: fire extinguishers
(ex gas storage area etc.
north side of work Air or Water Pollution Uncontrolled spillage leading to 3 2 3 18 Create sufficiently bunded areas with
on-site impact adequate natural or mechanical ventilation.
zone)
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208 8/04/2011
Page 18
fhe following permits are also applicable to the site:
I owcn Planning Permit No.:
Building Permit:
I
F1
H. Troon Pty. Ltd., Creswidc Road, Ballarat. Ph: (03) 5339 2208
I
I
Page 19
3 Environmental Management System Implementation
3.1 Control Measures
The following control measures are to be used to manage the environmental risks listed in Section 2.3. The following
areas have been determined to be significant environmental risk areas that require carefully planned management.
WASTE MANAGEMENT
Environmental Impact Areas: Stormwater Pollution; Visual Pollution; Waste to Landfill
iAc
am'r'TT'iTTiS?TU= T1i- Site Requirements
Construction Waste Construction Waste
Recycle and/or reuse 80% by weight of construction Refer to site Construction Waste Management Plan for
waste generated on-site detailed description of site waste minimisation strategies
Litter ,Management Litter :Management
Minimise visual pollution and impact on local amenity Ensure that suitable fencing is in place around site to contain
resulting from windblown litter from site windblown litter
No loose material that could be blown off-site is to be securely
stored. If loose material is stored outdoors, then it must be
suitably covered or tethered when not in use to prevent it
blowing away
Monitor litter situation and implement additional control
measures or educate employees to raise awareness, as
required
NOISE EMISSIONS
Environmental Impact Areas: Noise, Vibration
Site Requirements
Minimise noise and vibration arising from vehicle and Ensure that required noise reduction controls are fitted on all
equipment operations on-site equipment
I Provide noise attenuation screens around site where these are
feasible
Schedule deliveries to the site so that disruptions to local
amenity and traffic patterns are minimised
Where an activity is likely to cause a noise
• Nuisance to local environment
• Operating hours 7 am and 6 pm weekdays
• 7 am to 1 pm Saturday,
1
H. Troon Pty. Ltd.. Creswick Road, Ballarat Ph: (03) 5339 2208
Page 20
AIR EMISSIONS
Environmental Impact Areas: Dust. Exhaust Emissions
Environmental Standards Site Requirements
Dust Control
Minimise dust and exhaust emissions resulting
from vehicle and equipment operations, to Imptlement dust control measures to reduce
ensure there is no health risk or loss of amenity dus blowing off-site, e.g. lightly watering
due to emissions to the environment exposed areas when dust is observed,
installing wind fences (which will also assist
in controlling litter)
Exhaust Emissions
Ensure that required exhaust emission
controls are fitted on all on-site equipment,
and that equipment is maintained frequently
and serviced to manufacturers'
specifications
Smoke from internal combustion engines
should not be visible for more than ten
seconds. If it is, then servicing or parts
replacement may be required
GENERAL ENVIRONMENTAL REQUIREMENTS
Site Requirements
All employees must comply with site Ensure that all employees have received
environmental management requirements environmental training and know where to
access the Environmental Management
plan, if they need to.
Ensure contractors sign off Contractor
Environmental Compliance Checklist
3.2 Management Responsibilities
The Site Manager is responsible I'or ensuring the control measures detailed above and in the Site Construction Waste
Management Plan are implemented throughout the worksite. This includes the following requirements:
• All employees working onsite to have received environmental information at induction and know how to access
the Environmental Management plan and Construction Waste Management Plan.
• All subcontractors to have read Environmental Management Plan, Construction Waste Management Plan, and
signed off Contractor Environmental Compliance Checklist, prior to commencing any work on site
Site Manager to conduct weekly monitoring and reporting as detailed in EMP Section 3.4
3.3 Emergency Response Procedures
In general, the sequence to be followed in the case of an environmental incident (i.e. an event leading to uncontrolled
leaks, discharges, etc. that could have an effect on the local environment, or worker or public health or safety) is as
follows:
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
I
Page 21
a) Establish the source of the incident and prevent any further discharge by shutting down equipment or stopping
any leaks;
h) Clean up any spills, leaks. etc. using appropriate equipment e.g. spill response kit if required;
c) Immediately report the incident to the Site Manager, following the procedures outlined below;
d) Check for faults in equipment, or evidence of incorrect operation;
e) Service or replace equipment if required;
I f)
g)
Document the incident using the Environmental Incident Report form and report it to the Operations Manager;
and
Implement lessons learned from the incident to prevent future occurrences.
Following this initial response, the Site Manager is responsible for ensuring that follow-up and preventative actions
appropriate to the nature and scale of the incident are carried out. These follow-up and preventative actions are to be
documented using the Corrective & Preventative Action Report form.
All employees must also be familiar with the Site Safety Plan, which describes site first aid and evacuation
procedures and lists contact details for emergency response and environmental authorities.
3.4 Monitoring & Reporting
Regular environmental monitoring, recording, and reporting is to be carried out by the Site Manager using the Weekly
Environmental Report form, which is to be sent to the Operations Manager.
In the event of a significant environmental incident occurring, the Environmental Incident Report form must also be
used.
t 4 Supporting Documents
Erosion and Sediment Control: Construction Sites and Waterway Health
in south-east Queensland
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
I
Page 22
The South East Queensland Healthy Waterways
4.1.1 The regulatory framework
Strategy 2007-2012 identified land development as a
I
major contributor of sediment and other pollutants to
The key regulator of a site will be determined on a case-
Queensland's waterways.
by-case basis but generally speaking, state government
and local government controlled sites will be regulated by
Sediment is a contaminant that can seriously degrade
DERM using s440ZG of the Environmental Protection
water quality and starve marine life of oxygen, leading to
Act 1994 (CEP Act). Under the EP Act, it is an offence to
fish kills and damage to aquatic ecosystems.
unlawfully deposit 'prescribed water contaminants' in
There are many potential causes of water contamination; waters, roadside gutters and stormwater drainage. It is
however, in some catchments the highest recorded also unlawful to deposit a contaminant where it might
concentrations of pollutants in stormwater are of flow into such places.
sediment from land development sites.
Prescribed water contaminants (a full list of which can be
Rapid urban and infrastructure development in south- found in Schedule 9 of the Environmental Protection
east Queensland is predicted to cause a 60 per cent Regulation 2008) include:
increase in sediment loads to waterways within the next
20 years if a business-as-usual approach is maintained.
clay, gravel, sediment (including from building activities).
stones and similar organic and inorganic matter
More than 85 per cent of sediment that leaves an urban
development site does so during the construction phase.
earth, which the EP Act defines as sand, soil, silt or mud.
Improving the management of stormwater during the
construction phase of development and infrastructure Private development sites will be regulated by local
projects will: government through a development permit issued under
the Sustainable Planning Act 2009 (SPA) as well as
s440ZG of the EP Act.
• conserve topsoil - a valuable asset
Therefore, incidents involving water contamination within
• protect downstream waterways from the harmful a local government's jurisdiction will be deemed a breach
impacts of turbid stormwater of the development consent (under SPA) as well as a
breach of s440ZG of the EP Act.
• Reduce the likelihood of impacts to construction
t
timeframes and costs from wet weather or The general environmental duty (GED) as defined in
enforcement action. s319 (1) of the EP Act also applies. It states that a
person must not carry out any activity that causes, or is
Everyone involved in construction and development likely to cause, environmental harm unless the person
needs to take responsibility for erosion and sediment takes all reasonable and practicable measures to prevent
or minimise the harm.
I
control,
The Annual Compliance Plan 2010-2011 is publicly available online at
4.1 Erosion and sediment control compliance <www.erm. qld. gov.au>.
The Erosion and Sediment Control Compliance Project Refer to s493A under the EP Act for the definition of unlawful acts 2
(ESCCP) is part of the Department of Environment and
Resource Management's (DERM) Annual Compliance
Plan (ACP) 2010-2011 .
The aim of the ESCCP is to protect environmental values
of waters and water quality objectives in south-east
Queensland waterways by focussing on erosion and
sediment control during the construction phase of urban
land developments and infrastructure projects.
Department of Environment and Resource Management
(DERM) regional service delivery officers, in partnership
with local government officers, will be conducting
inspections of selected sites. This approach is designed
to ensure there is consistency across both levels of
I
government who share responsibility for regulating these
activities.
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
1
0
I
I
Page 23
H Troon Pty Ltd
3
This Act binds all persons, including the State, and as far as the legislative power of the Parliament permits, the Commonwealth
and the other states.
Available from 2011
These sections of the EP Act will apply to all sites whether they are owned and controlled by private
3
developers or state, commonwealth or local governments. This is reinforced in s22 of the EP Act.
A number of Queensland Government plans and policies assist in framing the regulatory approach for
erosion and sediment control on development sites. These include:
• The South East Queensland Regional Plan 2009-2031:
Desired regional outcome 11 - Policy 4.1: 'Ensure that development is planned, designed,
constructed and operated in accordance with best practice environmental management to
protect environmental values and meet the water quality objectives of all regional surface
waters, groundwaters, wetlands and coastal waters'.
• Environmental Protection (Water) Policy 2009:
Schedule 1 - Environmental Values and Water Quality Objectives for waters-
• State Planning Policy - Healthy Waters 2010:
Z The State Planning Policy (SPP) will ensure that development for urban purposes under the
Sustainable Planning Act 2009, including community infrastructure, is planned, designed,
constructed and operated to manage stormwater and waste water in ways that protect the
environmental values prescribed in the Environmental Protection (Water) Policy 2009.
What must be done to control erosion and sediment in construction runoff?
Planning and design, along with good erosion and sediment controls and monitoring systems, are the
keys to preventing environmental harm as well as reducing the likelihood of:
• storm repair costs on site, for example, clearing filled drains or replacing topsoil
• repair, administrative and/or legal costs to off-site properties, such as flooding or damage to
water supply dams
• enforcement action and associated costs.
I
When assessing sites for compliance with regulatory requirements, DERM and local government officers will be
referring to the 'Standard Work Method for the Assessment of the Lawfulness of Erosion and Sediment Control
Practices' . They will be assessing compliance with the conditions of a development approval, if one exists for the
site, and the general environmental duty.
I This should encompass the following:
• thorough and ongoing site assessments
• consideration of, and adaptation for, site specific erosion risk factors, including topography, soil
type, climate and season
• incorporation in the design, installation, operation, management, maintenance and monitoring
I
of control measures, which are consistent with the measures set out in the Standard Work
Method.
The following are some of the key measures that can be used to ensure erosion and sediment are
I controlled on a site:
Page 24
I
H Troon Pty Ltd 6 Environmental management plan and procedure
• stage the development to only clear areas immediately prior to earthworks
• cover stockpiles
• stabilise disturbed soil with cover
• rapidly stabilise completed areas
• divert clean stormwater around or through the site without causing increased turbidity or
erosion
• divert sediment-laden stormwater to sediment ponds
• treat and release clean water from sediment ponds as soon as practicable after a rain event.
What are the penalties for non-compliance?
DERM or local government officers will look to investigate and take appropriate compliance action
against activities that cause an adverse effect, or have the potential to cause an adverse effect, on an
environmental value.
Penalties for offences under s440ZG of the EP Act can be up to a maximum of $417 500.
s December 1010 CP9
For general enquiries contact the
Queensland Government call centre 13 74 68 (13 QGQV)
or visit www.derm.gld.gov.au
H.Troon Pty Ltd
Used in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.