                                                                                                                                     Environmental management plan and procedure

2.3     Risk Assessments of Operational Practices
The following risk assessment table lists potential environmental aspects and impacts associated with the project.

Environmental aspects classed as `significant' under this risk assessment are required to be addressed by the environmental management procedures detailed in
Section 3.1 of this EMP.

Operational                                                    Potential Impacts


      Site Excavation &      \V atcr foliation,                  ontununation of ]kcal                               I        Not r,^,1u11.d: minimal lik1:lihuod of gruundvvatcr
         Preparation                                           groundwater during excavation                                  contamination.
                                                               process. Contamination of                                      Swale and settling pond system to prevent
                                                               stormwater.                                                    contaminated run off.

                             Waste                             Excavated soil contaminated           3   4       4   48       Licensed operators and hygienists to co
                                                               with asbestos or oil and                                       ordinate excavated spoil. Site Construction
                                                               associated by-products                                         Waste Management Plan.
                             Soil Erosion                      Landslip or subsidence                4   I       2       8    Control using routine procedures as detailed in
                                                                                                                              Geotechnical Investigation
 Vehicle & Equipment         Air Emissions-                    Local impacts on ambient air          1   6       3   18       2.3.1.1    Control using routine site
      Operation              Vehicle Exhausts                  quality                                                                   environmental management
                                                                                                                                         procedures
                             Air Emissions-Dust                Windblown dust not contained          3   5   6       90       Manage using control measures listed in ENIP
                                                               within site; local environmental                               Section 3.1
                                                               impacts
                             Noise & Vibration                 Noise, vibration impact on local      2   5       3   30       Manage using control measures listed in EMP
                                                               residential and business                                       Section 3.1
                                                               amenity
                             Oil or Fuel Leaks                 Uncontrolled discharge to             3   2       3   18       Bunt relevant drainage systems when
                                                               stormwater drain                                               bunkering oils and fuels.
      Concrete Pouring       Waste                             Uncontrolled spillage, not            3   2       2   12       Control using routine site environmental
                                                               contained within site                                          management procedures
          Welding            Risk of Fire or Explosion         On-site incident leading to fire or   4   2       2       16   Adhere to SWMS's emergency response
                                                               explosion                                                      procedures in place.
      Dangerous Goods        Risk of Fire or Explosion         On-site incident leading to Fire or   4   2       2       16   Lockable isolated storage with appropriate
          Storage                                              explosion                                                      emergency procedures ie: fire extinguishers
(ex gas storage area                                                                                                          etc.
  north side of work         Air or Water Pollution            Uncontrolled spillage leading to      3   2       3   18       Create sufficiently bunded areas with
                                                               on-site impact                                                 adequate natural or mechanical ventilation.
  zone)




H. Troon Pty. Ltd., Creswick Road, Ballarat.      Ph: (03) 5339 2208                                                                                                    8/04/2011

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.