Environmental management plan and procedure
2.3 Risk Assessments of Operational Practices
The following risk assessment table lists potential environmental aspects and impacts associated with the project.
Environmental aspects classed as `significant' under this risk assessment are required to be addressed by the environmental management procedures detailed in
Section 3.1 of this EMP.
Operational Potential Impacts
Site Excavation & \V atcr foliation, ontununation of ]kcal I Not r,^,1u11.d: minimal lik1:lihuod of gruundvvatcr
Preparation groundwater during excavation contamination.
process. Contamination of Swale and settling pond system to prevent
stormwater. contaminated run off.
Waste Excavated soil contaminated 3 4 4 48 Licensed operators and hygienists to co
with asbestos or oil and ordinate excavated spoil. Site Construction
associated by-products Waste Management Plan.
Soil Erosion Landslip or subsidence 4 I 2 8 Control using routine procedures as detailed in
Geotechnical Investigation
Vehicle & Equipment Air Emissions- Local impacts on ambient air 1 6 3 18 2.3.1.1 Control using routine site
Operation Vehicle Exhausts quality environmental management
procedures
Air Emissions-Dust Windblown dust not contained 3 5 6 90 Manage using control measures listed in ENIP
within site; local environmental Section 3.1
impacts
Noise & Vibration Noise, vibration impact on local 2 5 3 30 Manage using control measures listed in EMP
residential and business Section 3.1
amenity
Oil or Fuel Leaks Uncontrolled discharge to 3 2 3 18 Bunt relevant drainage systems when
stormwater drain bunkering oils and fuels.
Concrete Pouring Waste Uncontrolled spillage, not 3 2 2 12 Control using routine site environmental
contained within site management procedures
Welding Risk of Fire or Explosion On-site incident leading to fire or 4 2 2 16 Adhere to SWMS's emergency response
explosion procedures in place.
Dangerous Goods Risk of Fire or Explosion On-site incident leading to Fire or 4 2 2 16 Lockable isolated storage with appropriate
Storage explosion emergency procedures ie: fire extinguishers
(ex gas storage area etc.
north side of work Air or Water Pollution Uncontrolled spillage leading to 3 2 3 18 Create sufficiently bunded areas with
on-site impact adequate natural or mechanical ventilation.
zone)
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208 8/04/2011
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.