                                               CONSEQUENCE DEFINITIONS
     Value         Effect               Definition
                   Noticeable           Minimal on oll-siic inipacl: fully controllable by routine procedures.
     2             Significant          Unlikely to cause oniofl site injury, damage or environmental impact. Event can be
                                        quickly and fully controlled.
     3             Seri
                   Serious              Potential for onsite injury and damage: on/off site environmental impact.
                                        Regulators may prosecute and community might express concern
                   Critical             Potential for major onsite injury and damage: onoff site environmental
                                        Impact. Regulators may prosecute and community likely to express concern
                   Disastrous           Potential lilt major oniotl site: injury, damage and environmental impact.
                                        Immediate action required. Prosecution and complaints almost certain.


    How often is the incident expected to occur'?

                                                FREQUENCY DEFINITIONS


r    Value


     3
                   Occurrence
                   Irv
                   Rare
                   Infrequent
                                        Frequency of Detection
                                                  once]
                                        1-2 times per year
                                        1-2 times per mon

t    4
     5
     6
                   Occasional
                   Frequent
                   Continuous
                                        Weekly
                                        Daily
                                        Hoary


    What is the probability that the environmental impact will result, once the incident has occurred'?

                                               PROBABILITY DEFINITIONS
     Value         Probability          Frequency of Occurrence
                   Remote               No such events liar CSer occurred
     2             Very Low             Isolated events have happened, but not for several years
     3             Low                  Isolated events are possible
     4             Moderate             Event has happened occasionally
     5             High                 Event has happened often
                                                                                                                             I
             - -
                   Vcr 111L,11          (onseguence is tilniost tics table


    The Risk Score is then calculated as follows: Risk = Consequence x Frequency x Probability (from the
    values in the preceding tables). For example, an event that would result in a Serious Consequence

t   (Score=3), with an Occasional Frequency (Score=4), High Probability (Score=5), results in a Risk Score of
    3 x 4 x 5 = 60. The risk priority is assigned in the Risk Score Definitions table below (e.g.: 60 is listed as a
         risk).
                                          RISK SCORE DEFINITIONS
     Risk Level       Risk Score        Immediate Action
                                 -III          ljmnclllately notify Jnc Alana cerand Project Alana,cr.
                                               Eflcctise interim controls to be implemented before task commences. Long-
                                               term control strategies shall also be implemented.
     High                     51-110           Immediately notify Site Manager who shall assess if, or with what controls,
                                               task can proceed.
     Significant              21-50            Communicate hazards details to affected personnel within five work days.
                                               Site Manager to implement appropriate long-term controls.
     Low                      9-20             Local management to control by routine procedures and instruction.
     Very Low                 1-8              Local work group to control.
    (AS'NLS 4360 Risk Management)



    For the purposes of this environmental management system, all environmental impacts assessed as having a
    risk level of 21 or above are considered to be `significant' and are shown in bold in the following table.

    Control systems for managing significant on-site environmental risks are described in Section 3. 1.




    H. Troop Pty. Ltd., Creswick Road, Ballarat.         Ph: (03) 5339 2208

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.