CONSEQUENCE DEFINITIONS
Value Effect Definition
Noticeable Minimal on oll-siic inipacl: fully controllable by routine procedures.
2 Significant Unlikely to cause oniofl site injury, damage or environmental impact. Event can be
quickly and fully controlled.
3 Seri
Serious Potential for onsite injury and damage: on/off site environmental impact.
Regulators may prosecute and community might express concern
Critical Potential for major onsite injury and damage: onoff site environmental
Impact. Regulators may prosecute and community likely to express concern
Disastrous Potential lilt major oniotl site: injury, damage and environmental impact.
Immediate action required. Prosecution and complaints almost certain.
How often is the incident expected to occur'?
FREQUENCY DEFINITIONS
r Value
3
Occurrence
Irv
Rare
Infrequent
Frequency of Detection
once]
1-2 times per year
1-2 times per mon
t 4
5
6
Occasional
Frequent
Continuous
Weekly
Daily
Hoary
What is the probability that the environmental impact will result, once the incident has occurred'?
PROBABILITY DEFINITIONS
Value Probability Frequency of Occurrence
Remote No such events liar CSer occurred
2 Very Low Isolated events have happened, but not for several years
3 Low Isolated events are possible
4 Moderate Event has happened occasionally
5 High Event has happened often
I
- -
Vcr 111L,11 (onseguence is tilniost tics table
The Risk Score is then calculated as follows: Risk = Consequence x Frequency x Probability (from the
values in the preceding tables). For example, an event that would result in a Serious Consequence
t (Score=3), with an Occasional Frequency (Score=4), High Probability (Score=5), results in a Risk Score of
3 x 4 x 5 = 60. The risk priority is assigned in the Risk Score Definitions table below (e.g.: 60 is listed as a
risk).
RISK SCORE DEFINITIONS
Risk Level Risk Score Immediate Action
-III ljmnclllately notify Jnc Alana cerand Project Alana,cr.
Eflcctise interim controls to be implemented before task commences. Long-
term control strategies shall also be implemented.
High 51-110 Immediately notify Site Manager who shall assess if, or with what controls,
task can proceed.
Significant 21-50 Communicate hazards details to affected personnel within five work days.
Site Manager to implement appropriate long-term controls.
Low 9-20 Local management to control by routine procedures and instruction.
Very Low 1-8 Local work group to control.
(AS'NLS 4360 Risk Management)
For the purposes of this environmental management system, all environmental impacts assessed as having a
risk level of 21 or above are considered to be `significant' and are shown in bold in the following table.
Control systems for managing significant on-site environmental risks are described in Section 3. 1.
H. Troop Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.