3 Environmental Management System Implementation
3.1 Control Measures
The following control measures are to be used to manage the environmental risks listed in Section 2.3. The following
areas have been determined to be significant environmental risk areas that require carefully planned management.
WASTE MANAGEMENT
Environmental Impact Areas: Stormwater Pollution; Visual Pollution; Waste to Landfill
iAc
am'r'TT'iTTiS?TU= T1i- Site Requirements
Construction Waste Construction Waste
Recycle and/or reuse 80% by weight of construction Refer to site Construction Waste Management Plan for
waste generated on-site detailed description of site waste minimisation strategies
Litter ,Management Litter :Management
Minimise visual pollution and impact on local amenity Ensure that suitable fencing is in place around site to contain
resulting from windblown litter from site windblown litter
No loose material that could be blown off-site is to be securely
stored. If loose material is stored outdoors, then it must be
suitably covered or tethered when not in use to prevent it
blowing away
Monitor litter situation and implement additional control
measures or educate employees to raise awareness, as
required
NOISE EMISSIONS
Environmental Impact Areas: Noise, Vibration
Site Requirements
Minimise noise and vibration arising from vehicle and Ensure that required noise reduction controls are fitted on all
equipment operations on-site equipment
I Provide noise attenuation screens around site where these are
feasible
Schedule deliveries to the site so that disruptions to local
amenity and traffic patterns are minimised
Where an activity is likely to cause a noise
• Nuisance to local environment
• Operating hours 7 am and 6 pm weekdays
• 7 am to 1 pm Saturday,
1
H. Troon Pty. Ltd.. Creswick Road, Ballarat Ph: (03) 5339 2208
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.