    3     Environmental Management System Implementation

    3.1   Control Measures
    The following control measures are to be used to manage the environmental risks listed in Section 2.3. The following
    areas have been determined to be significant environmental risk areas that require carefully planned management.


                                                      WASTE MANAGEMENT
                   Environmental Impact Areas: Stormwater Pollution; Visual Pollution; Waste to Landfill

                    iAc
                   am'r'TT'iTTiS?TU= T1i-                                              Site Requirements
    Construction Waste                                           Construction Waste

    Recycle and/or reuse 80% by weight of construction           Refer to site Construction Waste Management Plan for
    waste generated on-site                                      detailed description of site waste minimisation strategies
    Litter ,Management                                           Litter :Management

    Minimise visual pollution and impact on local amenity        Ensure that suitable fencing is in place around site to contain
    resulting from windblown litter from site                    windblown litter

                                                                 No loose material that could be blown off-site is to be securely
                                                                 stored. If loose material is stored outdoors, then it must be
                                                                 suitably covered or tethered when not in use to prevent it
                                                                 blowing away

                                                                 Monitor litter situation and implement additional control
                                                                 measures or educate employees to raise awareness, as
                                                                 required



                                                         NOISE EMISSIONS
                                              Environmental Impact Areas: Noise, Vibration
                                                                                       Site Requirements
    Minimise noise and vibration arising from vehicle and        Ensure that required noise reduction controls are fitted on all
    equipment operations                                         on-site equipment


I                                                                Provide noise attenuation screens around site where these are
                                                                 feasible

                                                                 Schedule deliveries to the site so that disruptions to local
                                                                 amenity and traffic patterns are minimised

                                                                 Where an activity is likely to cause a noise

                                                                  •    Nuisance to local environment

                                                                  •    Operating hours 7 am and 6 pm weekdays

                                                                  •    7 am to 1 pm Saturday,




1
    H. Troon Pty. Ltd.. Creswick Road, Ballarat   Ph: (03) 5339 2208

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.