                                               AIR EMISSIONS

                          Environmental Impact Areas: Dust. Exhaust Emissions

                  Environmental Standards                                Site Requirements
                                                             Dust Control
        Minimise dust and exhaust emissions resulting
        from vehicle and equipment operations, to            Imptlement dust control measures to reduce
        ensure there is no health risk or loss of amenity    dus blowing off-site, e.g. lightly watering
        due to emissions to the environment                  exposed areas when dust is observed,
                                                             installing wind fences (which will also assist
                                                             in controlling litter)


                                                             Exhaust Emissions


                                                             Ensure that required exhaust emission
                                                             controls are fitted on all on-site equipment,
                                                             and that equipment is maintained frequently
                                                             and serviced to manufacturers'
                                                             specifications


                                                             Smoke from internal combustion engines
                                                             should not be visible for more than ten
                                                             seconds. If it is, then servicing or parts
                                                             replacement may be required



                            GENERAL ENVIRONMENTAL REQUIREMENTS

                                                                         Site Requirements

        All employees must comply with site                  Ensure that all employees have received
        environmental management requirements                environmental training and know where to
                                                             access the Environmental Management
                                                             plan, if they need to.


                                                             Ensure contractors sign off Contractor
                                                             Environmental Compliance Checklist


    3.2      Management Responsibilities
    The Site Manager is responsible I'or ensuring the control measures detailed above and in the Site Construction Waste
    Management Plan are implemented throughout the worksite. This includes the following requirements:


    •          All employees working onsite to have received environmental information at induction and know how to access
            the Environmental Management plan and Construction Waste Management Plan.

    •         All subcontractors to have read Environmental Management Plan, Construction Waste Management Plan, and
            signed off Contractor Environmental Compliance Checklist, prior to commencing any work on site

    Site Manager to conduct weekly monitoring and reporting as detailed in EMP Section 3.4




    3.3 Emergency Response Procedures
    In general, the sequence to be followed in the case of an environmental incident (i.e. an event leading to uncontrolled
    leaks, discharges, etc. that could have an effect on the local environment, or worker or public health or safety) is as
    follows:


    H. Troon Pty. Ltd., Creswick Road, Ballarat.   Ph: (03) 5339 2208




I

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.