AIR EMISSIONS
Environmental Impact Areas: Dust. Exhaust Emissions
Environmental Standards Site Requirements
Dust Control
Minimise dust and exhaust emissions resulting
from vehicle and equipment operations, to Imptlement dust control measures to reduce
ensure there is no health risk or loss of amenity dus blowing off-site, e.g. lightly watering
due to emissions to the environment exposed areas when dust is observed,
installing wind fences (which will also assist
in controlling litter)
Exhaust Emissions
Ensure that required exhaust emission
controls are fitted on all on-site equipment,
and that equipment is maintained frequently
and serviced to manufacturers'
specifications
Smoke from internal combustion engines
should not be visible for more than ten
seconds. If it is, then servicing or parts
replacement may be required
GENERAL ENVIRONMENTAL REQUIREMENTS
Site Requirements
All employees must comply with site Ensure that all employees have received
environmental management requirements environmental training and know where to
access the Environmental Management
plan, if they need to.
Ensure contractors sign off Contractor
Environmental Compliance Checklist
3.2 Management Responsibilities
The Site Manager is responsible I'or ensuring the control measures detailed above and in the Site Construction Waste
Management Plan are implemented throughout the worksite. This includes the following requirements:
• All employees working onsite to have received environmental information at induction and know how to access
the Environmental Management plan and Construction Waste Management Plan.
• All subcontractors to have read Environmental Management Plan, Construction Waste Management Plan, and
signed off Contractor Environmental Compliance Checklist, prior to commencing any work on site
Site Manager to conduct weekly monitoring and reporting as detailed in EMP Section 3.4
3.3 Emergency Response Procedures
In general, the sequence to be followed in the case of an environmental incident (i.e. an event leading to uncontrolled
leaks, discharges, etc. that could have an effect on the local environment, or worker or public health or safety) is as
follows:
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.