H Troon Pty Ltd 6 Environmental management plan and procedure
• stage the development to only clear areas immediately prior to earthworks
• cover stockpiles
• stabilise disturbed soil with cover
• rapidly stabilise completed areas
• divert clean stormwater around or through the site without causing increased turbidity or
erosion
• divert sediment-laden stormwater to sediment ponds
• treat and release clean water from sediment ponds as soon as practicable after a rain event.
What are the penalties for non-compliance?
DERM or local government officers will look to investigate and take appropriate compliance action
against activities that cause an adverse effect, or have the potential to cause an adverse effect, on an
environmental value.
Penalties for offences under s440ZG of the EP Act can be up to a maximum of $417 500.
s December 1010 CP9
For general enquiries contact the
Queensland Government call centre 13 74 68 (13 QGQV)
or visit www.derm.gld.gov.au
H.Troon Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.