Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023

of 24

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
    H Troon Pty Ltd
    3
     This Act binds all persons, including the State, and as far as the legislative power of the Parliament permits, the Commonwealth
    and the other states.

        Available from 2011


    These sections of the EP Act will apply to all sites whether they are owned and controlled by private
                                                                                                                              3
    developers or state, commonwealth or local governments. This is reinforced in s22 of the EP Act.

    A number of Queensland Government plans and policies assist in framing the regulatory approach for
    erosion and sediment control on development sites. These include:

           •    The South East Queensland Regional Plan 2009-2031:

                Desired regional outcome 11 - Policy 4.1: 'Ensure that development is planned, designed,
                constructed and operated in accordance with best practice environmental management to
                protect environmental values and meet the water quality objectives of all regional surface
                waters, groundwaters, wetlands and coastal waters'.

           •    Environmental Protection (Water) Policy 2009:

                Schedule 1 - Environmental Values and Water Quality Objectives for waters-

           •    State Planning Policy - Healthy Waters 2010:

           Z The State Planning Policy (SPP) will ensure that development for urban purposes under the
              Sustainable Planning Act 2009, including community infrastructure, is planned, designed,
              constructed and operated to manage stormwater and waste water in ways that protect the
              environmental values prescribed in the Environmental Protection (Water) Policy 2009.



    What must be done to control erosion and sediment in construction runoff?
    Planning and design, along with good erosion and sediment controls and monitoring systems, are the
    keys to preventing environmental harm as well as reducing the likelihood of:


           •    storm repair costs on site, for example, clearing filled drains or replacing topsoil

           •    repair, administrative and/or legal costs to off-site properties, such as flooding or damage to
                water supply dams

           •    enforcement action and associated costs.




I
    When assessing sites for compliance with regulatory requirements, DERM and local government officers will be
    referring to the 'Standard Work Method for the Assessment of the Lawfulness of Erosion and Sediment Control
    Practices' . They will be assessing compliance with the conditions of a development approval, if one exists for the
    site, and the general environmental duty.


I   This should encompass the following:


           •    thorough and ongoing site assessments

           •    consideration of, and adaptation for, site specific erosion risk factors, including topography, soil
                type, climate and season

           •    incorporation in the design, installation, operation, management, maintenance and monitoring


I
                of control measures, which are consistent with the measures set out in the Standard Work
                Method.


    The following are some of the key measures that can be used to ensure erosion and sediment are

I   controlled on a site:

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.