Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
ri BIORETENTION BASIN & GROSS POLLUTANT TRAP
PURPOSES FUNCTION
t The bioretention basins installed at Bunnings Noosaville provides treatment of stormwater runoff as
well as improve the landscape amenity. The gross pollutant trap provides for primary treatment of
stormwater runoff prior to it discharging into the bioretention basin in order to capture sediment and
other gross pollutants.
The purpose of this bioretention basin maintenance plan is to detail the operational phase
I maintenance requirements of the bioretention basins installed at the proposed Bunnings Warehouse
at the corner of Gateway Drive and Noosa-Eumundi Dve. Routine maintenance of the bioretention
basins shall be undertaken by Bunnings to ensure to efficient operation of the stormwater quality
treatment train.
This maintenance plan should be read in conjunction with the Surface Water Management Plan for
the site.
BIORETENTENTION BASIN
PLANT ESTABLISHMENT
Establishment of vegetation within the bioretention basin is of critical importance as vegetation helps
maintain porosity of the filter media in the basin and removal of excess nutrients (considered a
pollutant at the high levels typical of urban stormwater runoff). The plant establishment period within
the first two years is the most intensive maintenance period with watering, weeding, and possible
replanting to be carried out. The following schedule for watering of plants should be followed:
• Week 1-2 3 visits/week
• Week 3-6 2 visits/week
• Week 7-12 1 visit/week
• After Week 12 As required during dry periods
REGULAR MAINTENANCE
The Water Sensitive Urban Design Technical Design guidelines for South East Queensland describe
the following typical maintenance requirements:
• Routine inspection of the bioretention basin profile to identify any areas of obvious increased
sediment deposition, scouring from storm flows, rill erosion of the batters from lateral inflows,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗