Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023

of 24

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
        •   Routine inspection of inflow systems, overflow pits and under-drains to identify and clean any

I       •
            areas of scour, litter build up or blockages.
            Removal of sediment where it is smothering the bioretention basin vegetation.
        •   Repairing any damage to the profile resulting from scour, rill erosion or vehicle damage by
            replacement of appropriate fill (to match onsite soils) and revegetating.


I       •


        •
            Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of
            clogging.
            Regular watering/irrigation of vegetation until plants are established and actively growing.
        •   Removal and management of invasive weeds (herbicides must not be used).
        •   Removal of plants that have died and replacement with plants of equivalent size and species.
        •   Pruning to remove dead or diseased vegetation material to stimulate growth.
        •   Vegetation pest monitoring and control.


    A maintenance checklist is to be completed for each scheduled maintenance and kept in a
    maintenance log. See Appendix A for a copy of the maintenance checklist.


    GROSS POLLUTANT TRAPS
    The gross pollutant traps require monthly visual inspection of the collection chamber for the first year
    to gain an understanding of seasonal variations in pollutant loads. The chamber should be emptied
    via eductor truck whenever it is over three quarters full in accordance with the manufacturers
    recommendations.      After the first year the inspection frequency may be reduced to quarterly and
    emptying scheduled in accordance with observations made in the first year of operation, but at least
    every 6 months.


    WATER QUALITY MONITORING
    In addition to the qualitative monitoring described in Section 5.2 of the Surface Water Management
    Plan, the following monitoring is to take place for a period of 3 years from commencement of use of
    the completed site;


        •   Every three months samples of the outflow resulting from rain events up to the 1 in 3 month
            ARI that produce sufficient outflow from the bioretention filter are to be taken from the
            bioretention underdrain junction pit.
        •   Samples are to be tested for the following parameters and limits;
                o Turbidity:                                 <10 NTU
                o Chlorophyll a:                             < 5 pg/L
                o Oxidised N:                                <60 pg/L
                o Ammonia N:                                 <20 pg/L
                o Organic N:                                 <420 pg/L

t               o Filterable reactive phosphorous:
                o Dissolved oxygen:
                o pH:
                                                             <20 pg/L
                                                             85-110% saturation
                                                             6.5-8.0
                o Total Nitrogen:                            <500 pg/L
                    Total Phosphorous:                       < 30 pg/L
                o Suspended Solids:                          < 6 mg/L

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.