Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
• Routine inspection of inflow systems, overflow pits and under-drains to identify and clean any
I •
areas of scour, litter build up or blockages.
Removal of sediment where it is smothering the bioretention basin vegetation.
• Repairing any damage to the profile resulting from scour, rill erosion or vehicle damage by
replacement of appropriate fill (to match onsite soils) and revegetating.
I •
•
Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of
clogging.
Regular watering/irrigation of vegetation until plants are established and actively growing.
• Removal and management of invasive weeds (herbicides must not be used).
• Removal of plants that have died and replacement with plants of equivalent size and species.
• Pruning to remove dead or diseased vegetation material to stimulate growth.
• Vegetation pest monitoring and control.
A maintenance checklist is to be completed for each scheduled maintenance and kept in a
maintenance log. See Appendix A for a copy of the maintenance checklist.
GROSS POLLUTANT TRAPS
The gross pollutant traps require monthly visual inspection of the collection chamber for the first year
to gain an understanding of seasonal variations in pollutant loads. The chamber should be emptied
via eductor truck whenever it is over three quarters full in accordance with the manufacturers
recommendations. After the first year the inspection frequency may be reduced to quarterly and
emptying scheduled in accordance with observations made in the first year of operation, but at least
every 6 months.
WATER QUALITY MONITORING
In addition to the qualitative monitoring described in Section 5.2 of the Surface Water Management
Plan, the following monitoring is to take place for a period of 3 years from commencement of use of
the completed site;
• Every three months samples of the outflow resulting from rain events up to the 1 in 3 month
ARI that produce sufficient outflow from the bioretention filter are to be taken from the
bioretention underdrain junction pit.
• Samples are to be tested for the following parameters and limits;
o Turbidity: <10 NTU
o Chlorophyll a: < 5 pg/L
o Oxidised N: <60 pg/L
o Ammonia N: <20 pg/L
o Organic N: <420 pg/L
t o Filterable reactive phosphorous:
o Dissolved oxygen:
o pH:
<20 pg/L
85-110% saturation
6.5-8.0
o Total Nitrogen: <500 pg/L
Total Phosphorous: < 30 pg/L
o Suspended Solids: < 6 mg/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.