Council archive · source document
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
o Conductivity: 500 pS/cm
Water samples shall be analysed by a NATA accredited laboratory. Results must be provided to
Sunshine Regional Council on a quarterly basis in digital format.
I Methods for rectification of problems identified through the monitoring process are identified in
Section 5.2 of the Surface Water Management Plan. Other methods of rectification may also be
implemented in liaison with the Sunshine Coast Regional Council.
RESETTING THE BASIN
If for some reason the bioretention basin media needs to be replaced this can be achieved with the
use of an excavator with a 30m arm, or other suitable means as identified by the operator of the
facility.
I
I
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.