Skip to the record
The only place to find full transcripts.

Council archive · source document

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023

of 24

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                o   Conductivity:                             500 pS/cm

    Water samples shall be analysed by a NATA accredited laboratory. Results must be provided to
    Sunshine Regional Council on a quarterly basis in digital format.

I   Methods for rectification of problems identified through the monitoring process are identified in
    Section 5.2 of the Surface Water Management Plan.         Other methods of rectification may also be
    implemented in liaison with the Sunshine Coast Regional Council.


    RESETTING THE BASIN
    If for some reason the bioretention basin media needs to be replaced this can be achieved with the
    use of an excavator with a 30m arm, or other suitable means as identified by the operator of the
    facility.




I


I
I

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.