Skip to the record
Search everything, all in one place.

Council archive · source document

07/1815 - Preliminary building works assessable against planning scheme [As Published] · 172007.1815

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  

DAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

Wild River Area.

It the responsibility of the applicarit to
determine if the evelopment is. proposed: in
‘a wild river area. ‘

“Information about wild:river areas:including the
geographical location and position of er
management areasiin relation to properties, car’,
be dccessed by contacting the Department of

‘Natural Resources and Water (NRW), accessing
the'department’s website iwininnw. ald. goviau or:
Contacting the department by email on:

> Wild [email protected]:au
Note on Referrals

‘Réfervals for development in a wild river.area’ :
(ther than for agricultural activities-and animat
husbandry activities) are not changed ftony'thé
existing referral afrangemenits, zl
‘Notes on development assessable
against the Wild Rivers Code

Fort information regarding development it in-a'witd
fiver area, see the relevant wild river declaration
* and Guide 27. Theretevantwild river.
declaration will pidvide information regarding
.which:types of.development must be assessed
+ against the Wild Rivers Code, and in some
‘Cases which types.of' development are exempt
from wild river requirements.
The riotes on development assessable against
the Wild Rivers Code in-this section: of the
checklist provide some guidance however this
«may vary between wild river areas, The relevant
declaration will provide the information applying
“to each wild river area.

  

 

Applications for some new developments will not |’ ”

“be.accepted:if the proposéd development is in a
high preservation area (HPA). Most applications
for development activities which may-be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Cade where indicated in a relevant
wild river declaration,

 

Which wild river area is the development proposed in in?

 

 

 

 

The proposed development is to.be located in: (tick the applicable bowes)
(11) a high préservation area (HPA);

(Di) a preservation area (PA) ; .

O itt) a wild river floodplain management area (FMA);

[_J iv) a wild river nominated waterway;

O v) a designated urban area (DUA).

 

 

Environmentally relevant activities 2.

(ERAs) in a designated urban area

ffyou answered: YES, your application for an
ERA is exempt from any wild river requirements
nd provided there are no other aspects of this
- development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

If you answered NO to Q2, please complete the
Temaining questions in Section 2,

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as:mapped in the relevant wild river declaration}?

i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59,
oO NO O YES (ensure you have completed Part G of Form 1)

 

 

Clearing native vegetation 3.

IF YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See

Guide 27 for a list of relevant purposes for | 4,

which an application may be made in a HPA.

IEYES and you ticked Q4 box i) the application
may be made and is assessable against the Wild |’
Rivers Code. If YES and you ticked 04 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

_ Is the application operational work for clearing native vegetation in a HPA?
Q NO O YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

O i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

: ET ii i in a HPA outside a registered area of agriculture?

 

Page 14

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1815 - Preliminary building works assessable against planning scheme [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.