INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas ‘

Ifyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
Assessed against and must comply with the Wild
Rivers Code.

Ifyou answered YES to Q5 and licked box i}'in®

Q6, your application is required to be referred to

-the EPA.

_Note: if specified works are-proposed in a toca |

government area, itis prescribed tidal work - the
sTelevant local govemment will be the
assessment manager with the EPA as a
concurrence agency

if you answered YES to Q5, and ticked box ii) or
iti) in Q6, your application tequires referral'to
‘DPIF.

of you answered'NQ to'Q5 and ticked box i) in
Q6, the. application will not be accepted.

“Ityou answered NO to Q5,'ticked box ii) in Q6
and the development i is Necessary to install
authorised works or infrastructure where a
‘development permit is not required, or if a
‘required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other

 

than specified works or as described above will |

Not be accepted.

tf you answered NO at Q5 and ticked box iii) in
Q6, the application may be made'if the works are
in aPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer

to Guide 27

IDAS Assessment Checklist, Version 20, 2 April 2007

{s the development for oy opediied works? (see defintion in the Wild Rivers Act 2005 and Guide 27-—

Development in a wild river area)

mie (yes

The application is for one or more of the following:

Oi i) Operational works that is tidal works or works in a coastal management district (ensure you

have completed Part M and/or Part P of Form 1}; or ©

oO if) Operational works for the removal, destruction or damage of marine plants (ensure you have

completed Part O2 of Form 1); Of

Oi iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

Residential, commercial or industrial
development

if you answered YES to Q7, your application is’
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

if you answered NO-to Q7 and ticked either box
i) or ti) in Q8, the assessing agency is the
felevant tocal government. The application must
be assessed against and must comply with the
Wild Rivers Code.

8.

Is the application for residential, commercial or industrial development in ina 3 designated urban

area?

Lino CT ves

If NO, does the application for residential, commercial or industrial development involve: .

Oi i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or *

LJ ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1).

 

Animal husbandry activities

Ifyou answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW. |

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for enimal husbandry activities (as defined

under the Wild Rivers Act 2005) in a PA?

CjNno

O YES (ensure you have completed Part R of Form 1)

 

 

Agricultural activities

if you answered YES to Q10, your application
Tequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
fot be accepted if proposed in a HPA. For more’
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
‘defined under the Wild Rivars Act 2005. For
more information see Guide 27,

 

10.

Does the application involve agricultural aclwvities (as defined under the Wild Rivers Act 2005) in

aPA?

(Jno

If YES is the application for:
("J i) a material change of use; or
DO ii) operational works.

Q YES (ensure you have completed Part Q of Form 4 )

 

* Page 12

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1815 - Preliminary building works assessable against planning scheme [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.