07/1815 - Preliminary building works assessable against planning scheme [As Published] · 172007.1815
- local goverment (see.EPA website for more
” are rere 16 Comnpiéte 22... . :
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities | 20.
Most applications for an ERA in-a HPA will not
“be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
‘some ERAs is: s assessed by NRW, othershave | 21,
been devolved to DPIF, NRW ‘or delegated
information on devolved ERAs)
If you answered NO to Q20 you do not need to | 99°
complete Qs 21-24. , 4
Kyou answered YES to Q20.and the
developmentis in a PA, your appli
assessed by the: istering ‘authority? * 23
against the Wild Code and must comply, .
. with thé code, unless the proposal i
. development where an ‘application willnot be |
| accepted, or is exempt from wild fiver
Tequirements (see Q2). You will be able to
determine if an application will not be-acceptéd
~for-the development by answering Q21- — 024.
Hyou answered NO to.Q21, youdo not need.to
‘answered YES to aaty you
+ Ifyou answere
is proposed i inth HPA‘
accepted. ff:you answers
“application must be assessed by sg
“NRW {as prescribed i in scheduile:8A of the: ipa)”
against the Wild Rivers Code and must comply
‘with the-code. .
\tyou answered YES to. Q24 the application will .) .
not be accepted. 'f you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply |
with the code.
Exempt ERAs in a designated -urban
area ,
If the development is proposed in a designated
Urban area there may be no wild river
Tequirements. See Section 2Q2.
Note; All applications. that can be accepted | must
be assessed against and must comply withthe
Wild Rivers Code (other than exémpt ERAs in a
designated urban area).
“4
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA? .
O NO . LIYES (ensure you have completed Part G of Form)
Is the application for an ERA 20 instream?
[Jno | Lives
Isa quarry allocation notice held for the proposed ERA 20 instream?
[no Lives
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex}
ii) an ERA 19 (dredging)
iil) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
{no (yes
Is the proposed development for ERA 20 (out of stream) and; 7 : @
— inaFMA;and | .
— not low impact; and :
— not for a residential complex in the area, or for specified works.
(Jno (Yes
Documentation 125.
Fyou answered NO to Q25, ‘your application’
may be subject to an information request and
processing of the application may be delayed.
Has documentation been included with the application describing how the applicant proposes to ®
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in'the relevant part/s of the Wild Rivers Code?
Lino | Dyes
2) The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1815 - Preliminary building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.