INTEGRATED PLANNING ACT'1907 ~~

Works that take overland flow water | 12.

The relevant wild river declaration will state
works that take overland flow water are either *
self assessable or assessable, or are exempt

from wild river requirements. 13.

Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers C Code
and must comply with the code.

ifyou ticked Q13 ii) an application i is not required
to be made however the works must comply wath’
the relevant self-assessable section of the Wild -
Rivers Code, otherwise the works become
assessable development:for which an application
is required and must bé assessed by NRW. +
‘against the relevant pait of the Wild Rivers. Code’
and must comply with the code, “

{fyou ticked Q13 ill il) your application is.not
subject to wild river requirements. .
Applications far development thatis other than, '
that stated to be assessable, self-assessable | or:
éxempt will not’ be accepted,

 

 

  

‘Tno

= =~ - IDAS Assessment Checklist, Version 20, 2 April 2007 \

Does the application involve works that take overland flow water ina HPA oran FMA? - 4
Q YES (ensure you have completed Part Ke of Form 1) ‘
If YES, is the application for works stated in the relevant wild river declaration to be?
(1) assessable works

(J ii) self-assessable works.

[7] ili) exempt works , \

ed

 

 

 

‘Works that interfere with overland = °| 14,

flow water

~The'elevant wild river.dectaration will state’.
works that intétfere with overland flow water

 

are either self assessable, assessable ot exenipt| 15.

‘fram wild river requirements. :
‘ifyou ticked Q15}}, your application must be
‘assessed by NRW against the Wild Rivers Code’.
and must comply with the code.

Nyouticked .Q15 ii) an application is not required
to be made however the works must comply with
the relevant sell-assessable section of the Wild
Rivers Code, atherwise the works become
assessable development for which ai application
is required and must be assessed by NRW °
against the relevant part of the Wild Rivers Code
and must comply with the code,

tfyou ticked Q15 ili) your apptication is not
Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not-be accepted.

Does the application involve works that interfere with overland flow water in a FMA?
oO NO im YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated i in the relevant wild rivers declaration tobe?
(Ji) assessable works

O ii) self-assessable works

O i exempt works

 

 

Waterway barrier works 16.

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES.to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve building o or raising waterway barrier works i in a PA?
O NO" O YES (ensure you have completed Part Os of Form 1)

 

 

Aquaculture (non ERA) 17.

Applications for aquaculture in a HPA will not be
accepted.

lf you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code,

Does the application involve aquaculture in a PA?
O NO O YES (ensure you have completed Part 01 of Form 1)

 

Works that interfere with waterina | 18.

watercourse

Note: if the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse {including dams or weirs,

stream realignment or steam diversion) wil not 19,

be accepted.

Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
ifyou tcked box ji) in Q49, your application will
fot be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and Jocations of nothinated.
waterways is availablé by contact NRW,
accessing the departnent’s website
www.niw.gid.qov.au ar contacting the
department by email on:

wild [email protected],gov.au.

 

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

QO NO YES (ensure you have completed the relevant Part K of Form 1)

If YES,
C i) The application is for an instream dam or weir; or

C ii) The application is for operational works that interfere with water in 4 watercourse, and is
for development other than a dam or weir.

Page 13

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1815 - Preliminary building works assessable against planning scheme [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.