Council archive · source document
Request for Further Information - 010.2006.00002689.001 [As Published] · 132006.2689
16. Please arrange for all engineering design plans and engineering reports
submitted with the application to be certified by an appropriately qualified
Registered Professional Engineer Queensland (RPEQ), as it is noted that none of
the plans nor any of the engineering reports have been prepared, checked, and
approved by an authorised person. In this regard none of the plans or the
engineering reports will be assessed in detail until a RPEQ has authorised them.
Council therefore reserves the right to make a second request for further
information upon review and assessment of the authorised documentation with
no consequence to IDAS time lines set by the Integrated Planning Act.
The applicant and any consultants assisting in the preparation of this
development proposal are advised that an independent check of some or all of
the technical reports and plans submitted may be forwarded to Council’s own
expert specialists, and the cost of this independent review will be borne by the
applicant.
Buildings Services
17. Please indicate how the building will comply with section C (Fire Resistance) of
the BCA (Building Code Of Australia) on the northern boundary and from building
to building.
18. Please indicate how the basement will comply with part F4.11 of the BCA
(Building Code Of Australia).
19. Please indicate how the basement will comply with part D1.4 (Exit travel
distances) of the BCA (Building Code Of Australia).
20. It appears that the building does not comply with the disable access or disable
toilet facilities. The building and environs should be designed to meet the
requirements of the Human Rights and Equal Opportunity Commission “Advisory
Notes on Access to premises” and AS 1428.1. Any services and facilities in the
building complex must allow independent, dignified and equitable use of the
facilities for all people. Show how the building will comply.
Environmental Health
21. Waste management is not suitably planned and point 4.4 of the Report
contradicts the ground floor plan. Therefore please submit a Waste Management
Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
Management Multi-Dwellings and Commercial and Industrial Premises”, for the
day-to-day operation of the development. It is critical that waste areas are
properly planned. A copy of Planning Scheme Policy No. 9 explaining exactly
how to predict waste quantities and design waste areas is available from Council
and the web. The Plan shall include the following information: -
The types of waste that will be generated from the activities approved
within the development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2006.00002689.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.