_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538 · 152006.862.02
152006.862.02
Plan of Survey
7 Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give
Council's Solicitor an appropriate undertaking in writing that in conjunction with
lodgement of the Plan of Survey at the Land Titles Office, the Title Deed, the
easement/s documents and any environmental covenant documents will also be lodged
and any additional Titles Office forms or requisitions requiring the consent of Council
being attended to forthwith.
8 In conjunction with the lodgement of the Plan of Survey for Council endorsement, all
legal documentation shall be presented to Council and shall be submitted in the correct
form with the fees prescribed in Council's adopted fee schedule.
9 Prior to Council endorsing the Plan of Survey, a certificate from a registered
Professional Civil Engineer shall be submitted to Council for each Development Permit
for Operational Works issued pursuant to this permit. The engineer shall certify those
works and that they have been completed in a workman like manner in accordance with
good engineering practice and in accordance with that permit.
10 Prior to endorsement of the plan of survey by Council, a metes and bounds plan shall be
submitted to Council indicating the house site and effluent disposal area/s on Lot 1 and
Lot 2.
11 Deleted.
Vegetation Covenant Area
12 An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994,
shall be registered, in favour of Council, over land within Lot 2 within 50 metres of the
northeastern property boundary to the Noosa River. The environmental covenant shall
be for the protection of the Coastal Management District. The covenant area must be
lodged with Council and agreed to by Council prior to survey plan approval.
Vegetation Protection & Weed Removal
13 Deleted.
14 Prior to approval of the Operational Works (Landscaping) for the development, the
following requirements must be completed:
a. A total bond amount of 1.5 times the schedule of works estimate of costs (plus
GST) for the re-vegetation work, including maintenance for three years, must be
lodged
b. The bond will be released based on achieving the performance objectives and
criteria over the ‘on maintenance’ period in accordance with the approved
vegetation management and revegetation plan in the following increments:
i. 10% for the first year
ii. 10% for the second year
iii. 80% in the final year
15 Existing trees on site and within the road reserve are to be retained, except where
required to be removed due to a building approval or the conduct of an approved use.
16. Vegetation removal, tree felling and lopping shall be undertaken in an environmentally
sensitive manner to avoid damaging surrounding vegetation, trees and habitat. Cleared
vegetation is to be suitably processed by one of the following methods and removed
from the site:-
16.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres
high with a minimum of 10 metres between edges of heaps.
Page 3 of 36
Document Set ID: 19816636
Version: 1, Version Date: 02/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.