Council archive · source document
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538 · 152006.862.02
152006.862.02
B. Amend Conditions 10 & 29 to read as follows:
10. Prior to endorsement of the plan of survey by Council, a metes and bounds plan
shall be submitted to Council indicating the house site and effluent disposal area/s
on Lot 1 and Lot 2.
29. Refer to the Department of Natural Resources and Mines’ conditions included as
Attachment 1 in the Department of State Development, Infrastructure and
Planning’s letter dated 6 June 2014.
C. Delete the requirement for a further Development Permit for Operational Works –
Landscaping.
D. Agree to extend the relevant period by 4 months to 12 September 2014 and change
Condition 2 accordingly.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Approved Plans
1 Development undertaken in accordance with this approval must generally comply with
the approved plan of development and as may be amended by these conditions. The
approved plan is:
Plan No. Rev. Plan Name Date
D-00510-01-J J Proposal Plan – Martoo Consulting 11/12/2008
Relevant Period
2 Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the relevant period
is four (4) years from the day this permit takes effect and ends on 12 September 2014
during which time all conditions must have been complied with, operational works
completed, and the Plan of Survey lodged with the Council for endorsement, unless an
application to extend the relevant period is approved by Council.
General
3. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
4. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
5. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
Fees
6 All outstanding rates and charges due and payable to Council in respect of the
reconfiguring of a lot shall be paid prior to endorsement of the Plan of Survey.
Page 2 of 36
Document Set ID: 19816636
Version: 1, Version Date: 02/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
_As Published -Change to Existing Approval & Extension to Relevant Period - 152006 862 02 - 1030538.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.