Skip to the record
Every meeting, every word.

Original source · versioned page text

Beach Road Retreats Stage 2 Conditions

Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).

of 19

Page text read automatically using OCR, there may be inaccuracies

132008.1779.1

 

4. The Preliminary Approval for a Material Change of Use of premises lapses on the
6 June 2015 if the total development is not complete by that date, unless otherwise
extended by Council.

5. The future car parking areas identified on the approved plans are not subject to this
approval.

6. All vegetation shall be retained, and the landscape rehabilitated and restored in
accordance with approved Conservation Precinct and Ecological Restoration Technical
Reports pursuant to the Noosa North Shore Eco-Tourism Portal Development Code,
and include at a minimum:-

6.1. The retention of significant trees and the rehabilitation and restoration of the
landscape within the Construction Access Zone as identified by the Arborist
Report of Significant Trees Rev B dated October 2007 prepared by Terrain
Consultants and shown on Vegetation Management Plan 02 50645 Dwg 2 Issue
SK, dated April 2007 prepared by Terrain Consultants;

6.2. The retention of all vegetation and the rehabilitation and restoration of the
landscape outside of the Construction Access Zone as shown on Construction
Access Zone Plan, Stage 2 Beach Road Retreats C1384-01-A dated 19
November 2010 prepared by Wolter Consulting Group; and

6.3. The retention of all vegetation and the rehabilitation and restoration of the
landscape within the 20 metre Landscape Buffer Zones and 20 metre Fire
Buffer Zones within the site in accordance with the Structure Plan of the Noosa
North Shore Eco Tourism Portal Development Code, excluding any vegetation
permitted for removal in accordance with Condition 4.2.

Details of vegetation to be retained and the landscape rehabilitation and restoratidn
works shall be detailed in an application for Operational Works — Landscaping
(Rehabilitation and Restoration).

7. Clearing of vegetation shall be in accordance with an Environmental Management Plan
and Fire Management Technical Report pursuant to the Noosa North Shore Eco-
Tourism Portal Development Code and may include:-

7.1. the clearing of vegetation other than significant trees within the Construction
Access Zones as identified by the Construction Access Zone as shown on
Construction Access Zone Plan, Stage 2 Beach Road Retreats C1384-01-A
dated 19 November 2010 prepared by Wolter Consulting Group;

7.2. the clearing of significant trees as identified by the Vegetation Management
Plan 02 50645 Dwg 2 Issue SK dated April 2007 prepared by Terrain
Consultants; and

7.3. the clearing of understorey vegetation, selective clearing of dead trees and a 5m
wide cleared fire trail, with passing bays in the Fire Buffer Zone as identified on
the Vegetation Management Plan 02 50645 Dwg 2 Issue SK dated April 2007,
prepared by Terrain Consultants and the Fire Management Technical Report.

8. Prior to the issue of a Development Permit for a Material Change of Use, the centre
point of the building locations shall be pegged and the trees tagged and numbered as
per the Arborist Report of Significant Trees prepared by Terrain Consultants and dated
October 2007. A site inspection shall be arranged with Council Officers to ensure
building locations do not compromise the health of nearby trees.

PD-DA-FM58/5-02/04/2009 Page 3 of 19

Log in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.