Beach Road Retreats Stage 2 Conditions

Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).

of 19

Page text read automatically using OCR, there may be inaccuracies

132008.1779.1

 

60.

61.

62.

Prior to the use commencing certification must be submitted to Council from an
appropriately qualified acoustic consultant which certifies that the limits specified in
condition 8 have been met.

Lighting devices to be installed on the site, i.e. security lights etc, are to be
appropriately designed, sited, installed and tested to be in accordance with Australian
Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting”. Prior to the
use commencing, certification shall be provided to Council from a RPEQ certified
Electrical Engineer, to demonstrate that the above requirements have been met.

All rainwater tanks must be constructed with mosquito proof screens (made from either
brass, copper, aluminum or stainless steel), and constructed with a mesh size of no
more than 1mm, and must be installed in a way that does not accelerate corrosion.
Tanks that contain flap valves must be installed so that when closed, mosquitoes
cannot pass through the valve.

Sewer Infrastructure

63.

64.

65.

66>

The internal sewerage reticulation system, including pump stations shall be constructed
to the Standards and Requirements as detailed in the Plumbing and Drainage Act
2002.

The internal sewerage reticulation system shall be designated as “private sewers” with
all operations and maintenance requirements the responsibility of the property
owner/body corporate.

Sewer house connection drains shall be located within the disturbance area for the
driveway if practicable.

Occupation of the “retreat” buildings and/or any other building shall not commence until
such time as the sewerage system is fully operational and connected to a permanent
sewerage treatment facility and disposal area as approved by the EPA.

Water Supply

67.

Water supply infrastructure for the development shall be designed to ensure
consistency with OO8c), 0015, Section 6.4 and Schedule F — 9.6.10 of the NNSETP
Code.

Infrastructure Policy Branch

Roadworks Contributions (Local Road Network)

 

 

68. In accordance with the "Noosa North Shore Eco-Tourism Portal Development Code", a
roadworks contribution of $16,697 towards the upgrading of Moorindil Street shall be
paid to the Council prior to the commencement of the use of any part of Stage Three.
This amount will be subject to variations in the Consumer Price Index, All Groups
Brisbane from March 2011 until the date of payment.

| 5. REFERRAL AGENCY CONDITIONS |
Referral Trigger Referral Status Referral Agency Referral Address
Site contains Concurrence Department of PO Box 573
assessable vegetation Natural Resources NAMBOUR QLD 4560
and Water
Site is within a 100 Advice Environmental Ecoaccess Customer
metre of a wetland Protection Agency : Service Unit,

PO Box 15155, CITY
» EAST QLD 4002

A copy of any referral agency conditions is attached.

PD-DA-FM58/5-02/04/2009 Page 9 of 19

Log in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.